My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AD/S COMPANIES -2015
Clerk
>
Contracts / Agreements
>
A
>
AD/S COMPANIES -2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 9:56:25 AM
Creation date
3/22/2016 3:44:52 PM
Metadata
Fields
Template:
Contracts
Company Name
AD/S COMPANIES
Contract #
A-2015-276
Agency
Community Development
Council Approval Date
12/1/2015
Expiration Date
12/1/2016
Insurance Exp Date
5/5/2016
Destruction Year
2021
Document Relationships
AD/S COMPANIES (2) -2015
(Amended By)
Path:
\Contracts / Agreements\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />MIA <br />C.0'MPAN1116 <br />11 M M <br />August 24; 2015 <br />Marc Morley <br />City of Santa Ana <br />20 Civic Center plaza (M -25) <br />Santa Ana, CA 62702 <br />Dear Marc, <br />Per your request for the slgnage bid for the Santa Ana Wayfinding project, we respectfully <br />submit the following for your consideration and approval, I have also attached our eBrcohure <br />which contains examples of simiiar high -end retail center and streetocepa frontage that was <br />completed by ADIS <br />As we stated In our proposal, our cost estimates are Based on our understanding of the slgnage <br />package that was provided to us on 8/11/2016 titled "Santa Ana Signage 100% DD Package ", <br />CAIr prices include: <br />1. Shop drawings <br />2, Engineering (Signs and attaclvnerlts) <br />3. Fabrication <br />4. Installation to be done during non net business hours (M•F, 7am -6pm.) Pdoe based off <br />prevailing wage labor Installation rates. <br />6, Sales taxes <br />0, Permit Acquisition Fees <br />Items to be provided by others- <br />1. Permit Fees <br />2• Lane and Sidewalk closures /traffic control <br />3, Any wall Backing or calling structure required is by others <br />4. Electrical to sign loontlon/tIms clocks <br />6. Message Schedule, Map Artwork, Site Plan with sign locations <br />6, Removal of Existing Signs <br />Additional Roof ificatiolis <br />Proposal Is based off of drawings provided and quantities listed on this quote, If sign counts <br />vary from this proposal, or if additional signs are required that is not listed on (file proposal, <br />AD /S will need to issue a new proposal <br />Thank you again for eflowing Amliltootural Doslgn and5lgns the opportunity to be a part of your <br />ronovatlpn at South Coast /''laze and look forward to reoeN1t7g yarn• l osponsa, <br />Resaec fully stibil7lttsd, <br />Nebo Kopur <br />zesa r'mI&ucloe cave, cemr," ca e�sob r soo asz�aauz r• sai.zraooal ��.�rn _ ___ _._...... <br />&a SlSn oga �Pnbelanllnn G; alaP liiyd �Ilr.IU red rf Li ahiin0'17A U:inlondno <br />
The URL can be used to link to this page
Your browser does not support the video tag.