My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19F - RFP DEMO 710 714 AND 720 E 6TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/05/2016
>
19F - RFP DEMO 710 714 AND 720 E 6TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 4:09:16 PM
Creation date
3/31/2016 2:22:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
19F
Date
4/5/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A — SCOPE OF WORK <br />PROJECT NAME: Demolition of Three Single - Family Dwellings <br />PROJECT LOCATION: 710, 714 and 720 E. 6th Street, Santa Ana, CA 92701 <br />OWNER: Housing Authority of the City of Santa Ana <br />Contact: Ray Lirette (714) 667 -2256 <br />GENERAL CONDITIONS <br />1. CONTRACTOR is responsible for obtaining all required permits. Permits fees will be paid by the <br />Housing Authority of the City of Santa Ana. <br />2. CONTRACTOR is responsible for contact Dig Alert prior to commencing the demolition. <br />3. CONTRACTOR shall comply with all applicable SCAQMD Rules and Regulations. <br />4. CONTRACTOR shall execute the work in accordance with the safety provisions of applicable laws <br />and the building codes including but not limited to Title 8, CCR Section 1529.Asbestos and <br />1532.1.Lead. <br />5. CONTRACTOR shall be responsible for any damages to property and /or injuries to persons as a <br />result of their execution of the work. <br />CONTRACTOR shall protect all surrounding material, equipment, furnishings from damage during <br />the course of the work. CONTRACTOR shall (at their own time and expense) repair and /or replace <br />any materials, equipment and furnishings that are damaged as a result of their execution of the work. <br />CONTRACTOR is responsible for obtaining any required permits and for paying any required fees. <br />EQUIPMENT EMISSIONS STANDARDS <br />CONTRACTOR is responsible for ensuring that all on -site construction equipment meets EPA Tier 2 or higher <br />emissions standards according to the following: All off -road diesel - powered construction equipment greater <br />than 50 hp shall meet Tier 2 off -road emissions standards. In addition, all construction equipment shall be <br />outfitted with best available control technology ( "BACT ") devices certified by the California Air Resources <br />Board ( "CARB "). Any emissions control device used by the CONTRACTOR shall achieve emissions <br />reductions that are no less than what could be achieved by a Level 2 or Level 3 diesel emissions control <br />strategy for a similarly sized engine as defined by CARB regulations. <br />HAZARDOUS MATERIALS <br />CONTRACTOR is responsible for thoroughly examining the lead and asbestos attached as Attachment Al and <br />Attachment A2. CONTRACTOR assumes full responsibility for compliance with all federal, state and local <br />regulations regarding the removal and disposal of all hazardous materials. <br />CONTRACTOR'S SIGNATURE DATE <br />Exhibit A must be signed and included in the proposal. Proposals that do not contain this document will be <br />considered non - responsive and rejected. <br />City of Santa Ana <br />Request for Proposals— Demolition of Three Single - Family Homes <br />1 =810 <br />
The URL can be used to link to this page
Your browser does not support the video tag.