My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - COOP AGMT - DIVERSION PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
20B - AA - COOP AGMT - DIVERSION PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:27:54 AM
Creation date
4/14/2016 5:04:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: Operation and maintenance activities, responsibilities and frequencies of each <br />project element are identified in the table below. The Project Stakeholders named in the <br />Memorandum of Understanding (MOU) that is currently under development will be <br />responsible for ensuring that all stakeholders are informed of the regulatory permit process <br />and provided an opportunity for review /comment as applicable. <br />Project Element <br />Operation and Maintenance <br />Responsibility <br />Frequency <br />Activity <br />Element 1 - <br />Removal of accumulated debris, <br />OCFCD <br />Every 30 days, after each <br />In Channel <br />sediment, floatables from the <br />rain event, or as required. <br />Diversion Structure <br />floatable debris boom <br />Also, prior to Oct. 1 and <br />after April 30. <br />Reset the debris boom <br />OCFCD <br />After each storm event that <br />exceedsthe2 -year storm <br />event water surface <br />Element 2 — <br />Removal of accumulated debris, <br />OCFCD <br />Every 30 days, after each <br />Channel Debris <br />sediment, floatables from <br />rain event, or as required. <br />Removal System - <br />Coanda screen and debris <br />Also, prior to Oct. 1 and <br />containment area <br />after April 30. <br />Cleaning of CDS unit <br />OCFCD <br />Every 6 months <br />Element 3 — <br />Inspection of pumps and wet <br />OCFCD <br />Every 6 months <br />Pumping Facilities <br />wells <br />Replacement of pumps <br />OCFCD <br />As needed (25 -year <br />minimum expected life <br />cycle) <br />11. Comment: The access road has to be moved within the golf course in a manner that <br />does not impact operation of the golf course. <br />Response: During project construction, the access road will be temporarily closed off, but the <br />bridge over the channel to the Front Nine will remain open. Long -term, the project has been <br />designed so that the re- aligned portion of the access road will be outside the golf course <br />existing lines of play. <br />12. Comment: Please add text regarding the project footprint requirements of the pipeline <br />and other features outside the County R/W as appropriate. <br />Response: The pipeline will be 1.6 miles long and placed in a 5 -foot wide trench in the <br />existing paved Bristol Street right -of -way. Pipeline construction plans will be reviewed and <br />approved by the City of Costa Mesa. <br />13. Comment: The existing access road is not open for public use at this time. Please revise <br />text as appropriate. <br />Response: It has been confirmed by Jeff Dickman of OCPW that the existing access road is <br />part of the Santa Ana Heights Regional Riding and Hiking Trail, a county master - planned <br />trail, and open for public use. The purpose for the trail is to connect the equestrian stable at <br />the OC Fairgrounds to Upper Newport Bay and to two other regional routes leading to Peters <br />20B -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.