My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - COOP AGMT - DIVERSION PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
20B - AA - COOP AGMT - DIVERSION PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:27:54 AM
Creation date
4/14/2016 5:04:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Page 2 -11, Vt paragraph: There is a reference to "Back and Front of the Ninth hole" and the <br />pedestrian bridge. These features should be labeled on Figures 5 and 6, If being reference <br />within the text of the IS /MND since reference Is "golf terminology" that everyone may not be <br />familiar with. <br />15. Page 2 -17, 1s' paragraph states, "The access ramp to the proposed facility will be gated <br />separately from access road for use by OCFCD for general maintenance and public recreation <br />trail." Please see page 2 -8, last paragraph regarding trail issue. There is no existing public trail <br />within the project site. Please delete all references to trails from the IS /MND. <br />16. Page 2 -18, Table 2.4 -1: "Permanent Maintenance Easement Needed (Square Feet) 13,380" and <br />"Sewer Easement Needed (Square Feet) 4,300." Please identify where these easements are. <br />Are they within streets, John Wayne Airport. or County property? <br />17. Page 3 -1, Section 3.1, Item No. 5 Project Sponsor's Name and Address: This Item omits OCFCD <br />as a sponsor. Definition of Sponsor needs to be clarified and the documents revised as <br />appropriate. <br />18. Page 4 -38, Section 4.9.1, item c, "Elements of the diversion facilities will be constructed within <br />the concrete -lined Santa Ana Delhi Channel and will not affect the flood control capacity, <br />drainage pattern of the area or alter the course of the channel." Please see also page 4-38, <br />item d and page -39, item h. It should be shown with analysis that the proposed in- channel <br />diversion facility and appurtenances will not affect the existing flood protection level provided <br />by the flood control facility. Please see comment no. 7 above also. <br />19. Page 4-48, Section 4.12.1.a states, 'These pumps will be completely submerged to a depth of <br />35 feet below grade." The plans show 32' below grade. Please verify and revise as appropriate. <br />20. Agreements between the OCFCD /County and project partners are required in order to define <br />the terms and conditions under which OCFCD /County will accept modifications to the channel <br />and /or accept /share right -of -way, maintenance responsibilities and associated costs before <br />construction starts and permits can be Issued for work within OCFCD /County right -of -way. <br />21. Please add the Preliminary Design Report including supporting technical report(s) under <br />"Appendices" on page ii of the IS /MND. <br />If you have any questions or need clarification please do not hesitate to contact Mehdi Sobhanl at <br />(714) 667 -3998 or Penny Lew at (714) 647 -3990. <br />Environmental Resources: <br />1. Section 1.0, introduction (page 1 -5): The reference to OC Public Works Watershed Protection <br />Group in the third paragraph should be changed to OC Public Works Environmental Resources <br />Division. <br />300 N. Flower Street, Santa Ana, CA 02703 <br />P.O. Box 4048, Santa Ana, CA 927024048 <br />20B -21 <br />www.00publlcworks.com <br />714.087.0800 1 I nFo @OCP W.00gov.00m <br />
The URL can be used to link to this page
Your browser does not support the video tag.