My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - CENTENNIAL LAKE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
25B - AGMT - CENTENNIAL LAKE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:33:04 AM
Creation date
4/14/2016 5:30:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />2 Scope of Services Schedule <br />Scope of Work <br />Dudek will provide preliminary engineering services to collect and review existing background <br />data. Data collection includes right -of -way documents, existing utilities plans, soils and geologic <br />Information, "as- built" construction drawings for the lake, park and existing nearby utilities, existing <br />hydraulic and master plans of drainage, irrigation plans, previous project reports, and proposed <br />development plans. In addition, a field reconnaissance investigation of the project study area will be <br />performed. The field investigation will include a verification of the site conditions and accuracy of the <br />existing improvement plans. <br />Soil Analysis <br />• Excavate 5 small diameter borings to depths of 2 feet below the existing lake bottom. <br />Borings depths of 2 feet are based upon the assumption that the sediment on the lake <br />bottom is no more more than 1 -ft deep. We will geologically log the borings in <br />accordance with USCS standards and will collect samples for laboratory testing. The <br />borings will be backfilled with bentonite upon completion. <br />• Perform laboratory testing which is anticipated to include grain size analyses, maximum <br />density /optimum moisture, in -situ moisture and density, direct shear, compaction, <br />permeability, and soil salinity. The laboratory test program will be determined based on <br />soil conditions encountered during our exploration. <br />• Prepare a written report presenting our findings and conclusions and recommendations <br />regarding the proposed crossings, retaining (wing) walls, and pavement sections. <br />De9lverable: Soil sample analysis results, narrative interpretation of relevant soil characteristics <br />Water Quality Analysis <br />Dudek will obtain lake water samples and have them tested in a lab certified by the California <br />Department of Public Health. The lab will run a standard lake water quality test including: <br />• Surface Dissolved Oxygen reading <br />• Nutrients • -Total Phosphorus <br />• Water Clarity Turbidity, Color, Total Dissolved Solids <br />• Salts — Chloride, Conductivity <br />• Acid /Base Readings — pH, Total Alkalinity, Total Hardness <br />The test results will be used to provide physical indicators of specific problems with the lake water <br />quality and markers for measurement of improvement of the lake water quality after rehabilitation of <br />the lake. The lake water quality system will be designed to address the undesirable biological and <br />chemical components identified in the lake water. <br />Deliverable Water quality sample analysis results, narrative interpretation of relevant water quality <br />characteristics <br />M.1 t.)E K Centennial Park Lake Circulation and Aeration Study 11 <br />25B -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.