My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - AGMT - DELHI DIVERSION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
20B - AA - AGMT - DELHI DIVERSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:17:31 PM
Creation date
4/28/2016 2:22:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Section 2.4.2, Project Operations (pages 2-9 to 2-10): This section breaks down project <br />operations during the non -storm season and storm season. The document defines the storm <br />season as October 16 to April 14 and the non -storm season as April 15 through October 15. In <br />order to be consistent with local municipal stormwater permits and related <br />municipal/industrial/construction site inspections and maintenance that are to be conducted <br />during the storm or non -storm seasons, the timeframes should be defined as October 1 to <br />April 30 and May 1 to September 30, respectively. <br />Flood/SAR/Traiis: <br />1. Over 15 years ago, the County of Orange built a portion of its Santa Ana Heights Regional <br />Riding and Hiking Trail, a county master -planned dirt trail. The trail is currently open along the <br />east side of the channel from Irvine Avenue upstream to Santa Ana Avenue. The trail is open <br />from sunrise to sunset for use by walkers, joggers, runners, mountain bicycle riders and <br />equestrians. The trail is planned to connect the Orange County Fairgrounds to Upper Newport <br />Bay Nature Preserve, the Peters Canyon — Irvine Coast Regional Riding and Hiking Trails and the <br />Mesa Drive Trail. <br />• The proposed project must not interfere with the public's use of this trail or alter the <br />existing decomposed granite trail tread, which is a hallmark of County's natural -surface <br />trails. <br />• Any alteration, detour, temporary closure or reconstruction of the Santa Ana Heights <br />Regional Riding and Hiking Trail must be approved in writing by the County prior to the <br />start of work. <br />• Applicant will be responsible for any repairs to the decomposed trail tread, signage, <br />bollards, gates and other trail -related amenities. <br />If you have any questions or need clarification please do not hesitate to contact Jeff Dickman at <br />(714)647-3937, <br />Sincerely, <br />Laree to so, Manager, Planning Division <br />OC Pu ' Works Service Area/OC Development Services <br />300 North Flower Street <br />Santa Ana, California 92702-4048 <br />Laree.alonso ocpw.oc&ov.com <br />cc: Mehdi Sobhani, Manager, OC Public Works/Flood Programs <br />Chris Crompton, Manager, OC Public Works/Environmental Resources <br />Jeff Dickman, OC Engineering, OC Public Works/Flood/SAR/Trails <br />300 N. Flower Street, Santa Ana, CA 92703 <br />P.O. Box 4048, Santa Ana, CA 92702-4048 <br />www.ocpu blicworks. corn <br />714.667.8800 1 Info@OCPW.ocgov.com <br />20B-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.