My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
20C - AA - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:18:21 PM
Creation date
4/28/2016 2:23:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Storm [gain Master Plan <br />Phase 2 1 Rt P No. 16-02 <br />Profile <br />As part of our commitment to the water resources <br />field, Michael Baker has a specialized staff of over <br />40 local engineers dedicated to flood control <br />engineering, storm water management and water <br />quality services in California, providing the City of <br />Santa Ana a team with tremendous depth of <br />resources and experience. Supporting these local <br />resources, Michael Baker offers one of the largest engin( <br />design, and construction management firms in the counts <br />professional staff of more than 6,000 employees in 90 of <br />nationwide. <br />Demonstrated Storm Drain Master Plan Experience <br />We bring to this project the technical capabilities needed <br />develop an effective drainage master plan, along with a t <br />successfully working with the City, the County of Orange, local <br />communities, public agencies, and stakeholders to incorporate <br />their concerns and issues into the development of innovative and effective project solutions. This team <br />is proficient at employing state-of-the-art modeling tools, data management, and "green" infrastructure <br />retrofitting for high quality and cost effective surface water storage solutions. <br />z �"'�.s.1". ,r ��^_'_ga ew z'�-. E ) t` �3na2 �� .f � x w�wk s�� • : •- -•••• <br />�� YAK-"�St sPr'z"3 .'-c� � � ''T fi,�'i �'. �` M�. it aii s � •• N •, �:• � • �_ <br />�„�isy? �,-:.� �' ,r.+.�zs t`i �H-.0 �. is: � ,���z} � ,•_ is <br />•StormtDrain• National Pollutant Discharge <br />City <br />City of Redlands, Master Drainage Plan©©■ Elimination e <br />ents to help secure <br />City4buena Park, Stor—m—Drain Master Plan■©■funding assistance. Our wide <br />City-ofCounty of Orange - San Diego Creek Master Plan of Drainage variety of experience includes <br />Rancho Palos Verdes Master Plan of Drainage —Moo siting, designing, and <br />.naheim — Storm Drain Master Plan BEE implementation of BMPs forMEN water quality treatment. The <br />Michael Baker Team has a <br />••• yamMEE cl ear understanding of the <br />requirementsregulated <br />Ar <br />WIN NOW 011611011W <br />•,f retrofit locations. <br />Page l 2 <br />INTERNATIONAL <br />20C-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.