My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
20C - AA - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:18:21 PM
Creation date
4/28/2016 2:23:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 19 <br />t� �) Storm Drain Master Play <br />^ Phase 2 I rtFP No. 16-0 <br />Yuba Sutter Regional Conservation Plan (Habitat Conservation Plan/Natural Communities <br />Conservation Plan), Project Manager. The plan area encompasses 450,000 acres. The participants <br />include two counties, three cities, and the Department of Water Resources. Michael Baker International <br />is working closelywith local and resource agency representatives In developing a conservation strategy <br />for 26 species of plants and animals that will ensure the continued survival of those plants and animals, <br />while simultaneously accommodating private property rights and foreseeable future urban <br />development. Sophisticated biological and geographical analyses were used to design a conceptual <br />preserve system that maintains habitat connectivity. Prepare several successful grant applications. <br />Salinas Valley Solid Waste Authority Crazy Horse Sanitary Landfill Permitting, Project Manager. <br />Managed the regulatory permitting to implement the closure plan. The Crazy Horse Sanitary Landfill is <br />located on a 160-acre parcel in Salinas. <br />City of Santa Rosa, Santa Rosa Subregional Long -Term Wastewater Project EIR/EIS, Task <br />Manager. Managed $2 million of technical biological studies to support the EIR/EIS and permit <br />processes. Prepared biological sections of the EIR/EIS, which compared five alternatives at an equal <br />level of evaluation. <br />Paradise Irrigation District, Water Supply Alternatives Environmental Feasibility Analyses, <br />Project Director. Directed site assessments and environmental analyses for the Water Supply <br />Alternatives Environmental Feasibility Analyses Report, per Proposition 204 grant funding <br />requirements. Prepared an environmental feasibility study in order to evaluate alternative actions that <br />the district could undertake to meetfuture water needs and ensure a reliable and adequate water supply <br />for the district's service area. <br />Paradise Irrigation District, Magalia Reservoir Raw Water Bypass Project, Project Manager. <br />Managed environmental constraints analysis. Prepared the Initial Study and Mitigated Negative <br />Declaration; Clean Water Act 404, 410, 1602 Streambed Alteration Agreement; and USFWS biological <br />assessment for a water diversion project on Little Butte Creek. <br />Colusa Basin Drainage District, Bureau of Reclamation, Freshwater Basin Watershed <br />Management Program, Technical Advisor. Provided technical advice, environmental analyses, and <br />agency coordination for a flood control feasibility study. <br />California Public Utilities Commission, Pacific Gas & Electric (PG&E) Company Hydro - <br />Divestiture Project EIR, Technical Director. Conducted a statewide biological assessment of the <br />potential effects of divestiture of multiple PG&E hydroelectric facilities and land holdings. Coordinated <br />staff of four companies. <br />AiY ,, ha, 11, f, I Ri6tvrw <br />INTERNATIONAL <br />20C-48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.