My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - CENTENNIAL NEIGHBORHOOD WATER MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
23A - PROJ - CENTENNIAL NEIGHBORHOOD WATER MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:18:52 PM
Creation date
4/28/2016 2:23:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replace with: <br />This work shall include constructing AWWA C900, Class 235 DR18, PVC Water Main, and <br />appurtenances complete and in place, of the size and class, and to the alignment and grade <br />indicated on the plans. Fittings shall be gray or ductile iron conforming to AWWA Standards <br />as noted on the plans unless noted otherwise, <br />3. QUESTION: <br />Specifications page mentions all fittings to be Push On Joint and Flanged, but Plans call out <br />all fittings to be Mechanicals Joint and Flanged. <br />Response: <br />All Fittings shall be installed as noted on the construction plans. <br />4, QUESTION: <br />In Special Provision Section 7.03 page 32, 51h paragraph, last sentence, it is stated <br />"Contractor shall supply new sewer manhole frame and covers, sewer cleanout frame and <br />covers, concrete rings and water valve pot frame, canister and lids per City standard plans." <br />Is this meant to mean we need to replace all these items on the project? Or is this meant to <br />mean to replace them as they are either damaged by our work or found to be damaged? <br />Response: <br />All utility covers, frames, concrete rings, canister and lids impacted by contractor activities <br />shall be replaced and adjusted to grade. <br />FOR THE CITY CIF-S'ANTA ANA <br />Edwin "William" <br />City Engineer <br />2of2 <br />5ANTA ANA CrrY COUNCIL <br />Mrgum A. PWId. W..w F-. 3a,mrenly Mmht© Ma6"Le, A M,., Arnez[ua P DMW NIIM,des Numan Rey". Sal ➢nyero <br />May., May.1 o.fe ,Wards Ward". Wwd3 W.1d4 Wa,d5 Wa,d6 <br />�IL�.4�,J�Sa.W� „Gaf_NPnla. a5ag14. dnd.4f9 91 �&F�,ti1131N^3i,4J d29S34y3C,Psant:+-um.o,u 6 16 ('U 1 91M9 e�Si'tl�'dllU_a aL419 SptklS kn1,1, is u, - I9 <br />23A-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.