My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - CENTENNIAL NEIGHBORHOOD WATER MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
23A - PROJ - CENTENNIAL NEIGHBORHOOD WATER MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:18:52 PM
Creation date
4/28/2016 2:23:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO, 09-3213 <br />CENTENNIAL PARK NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />Item <br />Bid Item <br />Unit <br />City <br />Unit Price <br />Amount <br />14 * <br />Combination Air Valve (As <br />EA <br />10 <br />Needed) <br />Vertical Offset (As <br />15. * <br />Needed, Prior Approval <br />EA <br />10 <br />$ l.��i dr <br />$/�,- �ri,ev <br />From The Engineer <br />Required) <br />16.* <br />Imported Backfll Material <br />CY <br />100 <br />$ 8 10 <br />$ u, ��; le" <br />(As Needed) <br />17. <br />In -Line Insertion Valve <br />EA <br />10 <br />$ ' 0 <br />$ 7) avv, uv <br />18. <br />Prepare SWPPP <br />LS <br />1 <br />$ cD <br />19.** <br />As-Built <br />LS <br />1 <br />$ 3 00 <br />$ 35000 <br />TOTAL BID <br />$ t_q Z, 02 00 <br />The lowest responsible bidder shall be selected based on the total base bid, The City reserves the right <br />to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "259/o° limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this Item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />" * Fixed Price Bid Item <br />TIME FOR COMPLETI N OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />1Blddgr signature must be shown on same pagg as total bid amount shgyorlgn table) <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within two hundred thirty (g1QJw2ft1,daU after the commencement date stated in the <br />Notice to Proceed. The bidder also proposes to commence construction of the Work within thirty <br />(30) days after issuance of a Notice to proceed, and to continue in a diligent and workman -like <br />manner without interruption, and to complete the construction thereof within the time specified <br />above, <br />The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,000 per calendar day. <br />Name of Firm <br />Signature of BIDI <br />Title Y (e" 'i(jej <br />(if an individual, so state) <br />P-2 of P-1 S <br />23A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.