Laserfiche WebLink
Appendix <br />ATTACHMENT <br />a co FEE SCHEDULE <br />GEOTECH N 1 CAL, SPECIAL 1N SPliU'I I V 1N, X IVIA 1ERLAL I La l L'R, <br />ITEM <br />ESTIMATED <br />QUANTITY <br />UNIT <br />HOURLY RATE/ <br />UNIT COST* <br />ESTIMATED <br />COST <br />Soil Inspection <br />1000 <br />Hours <br />$ 87,00 <br />$ 87,000.00 <br />Concrete Inspection <br />1500 <br />Hours <br />$ 87,00 <br />$ 130,500.00 <br />Masonry Inspection <br />800 <br />Hours <br />$ 75.00 <br />$ 60,000.00 <br />Reinforcing Steel <br />Inspection <br />1200 <br />Hours <br />$ 75.00 <br />$ 90,000.00 <br />Apshalt Concrete <br />Inspection <br />500 <br />Hours <br />$ 87.00 <br />$ 43,500.00 <br />6" Concrete Cylinder <br />400 <br />Hours <br />$ 20.00 <br />$ 8,000.00 <br />2x4 Mortar Sample <br />200 <br />Hours <br />$ 15.00 <br />$ 3,000.00 <br />3x3x6 Grout Sample <br />200 <br />Hours <br />$ 15.00 <br />$ 3,000.00 <br />Masonary Prisms <br />150 <br />Hours <br />$ 70.00 <br />$ 10,500.00 <br />Ultrasonic Testing of <br />Steel Connectors <br />50 <br />Hours <br />$ 92.00 <br />$ 4,600.00 <br />Post Tension Reinforcing <br />Inspection <br />200 <br />Hours <br />$ 75.00 <br />$ 15,000.00 <br />Post Tension Concrete <br />Inspection <br />200 <br />Hours <br />$ 87.00 <br />$ 17,400.00 <br />Structural Steel Inspection <br />100 <br />Hours <br />$ 87.00 <br />$ 8,700.00 <br />Connection Bolt Torque <br />Testing <br />100 <br />Hours <br />$ 87.00 <br />$ 8,700.00 <br />Precast Concrete <br />350 <br />Hours <br />$ 75.00 <br />$ 26,250.00 <br />Deputy Inspection <br />100 <br />Hours <br />$ 87,00 <br />$ 8,700.00 <br />Mechanical Inspection <br />100 <br />Hours <br />$ 75.00 <br />$ 7,500.00 <br />Plumbing Inspection <br />100 <br />Hours <br />$ 75.00 <br />$ 7,500,00 <br />Electrical Inspection <br />100 <br />Hours <br />$ 75.00 <br />$ 7,500.00 <br />TOTAL, ESTIMATED COST $547,350.00 <br />Page 2 of 2 <br />City of Santa Ana RFP 15-055 <br />Page A4-1 <br />25N-22 <br />