Laserfiche WebLink
Schedule of Pees <br />Effective July 1, 2015 <br />Schedule of Fees for Laboratory Services <br />Concrete Tests Cost (per test <br />C400 <br />6 x 12 Cylinder: Compression Strength (ASTM C39) ......................... ................ <br />$ 25 <br />C401 <br />6 x 6 x 18 Flexural Beams Not Exceeding Referenced Size (ASTM C78, C293, or <br />CTM 523) <br />$ <br />...... .................... ................. ...... ....... .................. —...... ,... ,...,.,........ ...,,....,..........., <br />$ 80 <br />C402 <br />Cylinders: Splitting Tensile Strength (ASTM C496). ...... ................. ................ ...... <br />$ 80 <br />C404 <br />Coring of Test Panels in Lab, each......................................................................... <br />$ 25 <br />C405 <br />Diamond Sawing of Cores or Cylinders (ASTM C642) ............. .............................. <br />$ 25 <br />C406 <br />Density, Absorption, and Voids in Hardened Concrete (ASTM C642) .................... <br />$ 300 <br />C407 <br />Modulus of Elasticity Static Test (ASTM C469) ...................................................... <br />$ 125 <br />C408 <br />Unit Weight Including Lightweight Concrete......................................................... <br />$ 65 <br />C409 <br />Drying Shrinkage Up to 28 Days: Three 3 x 3 or 4 x 4 Bars, Five Readings up <br />$ <br />by quote <br />to 28 Dry Days (ASTM C157).................................................................................. <br />$ 375 <br />C410 <br />Additional Reading, Per Set of Three Bars ............................................ <br />$ 45 <br />C411 <br />Storage Over Ninety (90) Days, Per 5et of Three Bars, Per Month „ <br />$ 35 <br />Concrete Block ASTM C14O Cost (per test) <br />C413 <br />Absorption/Moisture Content/Oven Dry Density (3 Required per ASTM), each <br />$ <br />80 <br />C414 <br />Linear/Volumetric Shrinkage (ASTM C426) ...............:............ ............................... <br />$ <br />90 <br />C415 <br />Web and Face Shell Measurements..........................,........................................ <br />— <br />$ <br />35 <br />C416Tension <br />Test........................................................................................................ <br />$ <br />150 <br />0418 <br />Shear Test of Masonry Cores: 2 Faces................................................................... <br />$ <br />70 <br />C419 <br />Efflorescence Test (3 Required), each.................................................................... <br />$ <br />35 <br />Laboratory Trial Hatch: Cement Concrete. Grout and Mortar <br />Cost (per test <br />L450 <br />All trial batch for cement, concrete, grout, mortar, etc,.,.....,.. ........... .............. —, <br />$ <br />by quote <br />Brick Masonry Tests <br />Cost foer test) <br />M500 <br />Modulus of Rupture: Flexural (5 Required Per ASTM), each ..,....... — .................... <br />$ <br />40 <br />M502 <br />Absorption: 5 Hour or 24 Flour (5 Required), each ............................................... <br />$ <br />40 <br />M503 <br />Absorption (Boil): 1, 2, or 5 Hours (5 Required), each ........................................... <br />$ <br />70 <br />M504 <br />Initial Rate of Absorption (5 Required), each .............................. .................. <br />$ <br />30 <br />M505 <br />Efflorescence (5 Required), each........................................................................... <br />$ <br />75 <br />M507 <br />Shear Test on Bricl<Core: 2 Faces, each................................................................ <br />$ <br />70 <br />Page 2 of 5 <br />25N-25 <br />