My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25N - AGMT - TESTING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
25N - AGMT - TESTING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2016 3:23:22 PM
Creation date
4/28/2016 3:11:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25N
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule of Fees <br />Effective July 1, 2015 <br />Page 5 of 5 <br />25N-28 <br />Metal Testing <br />Cost (per test) <br />R714 <br />Hardness Test (Rockwell) and 0rinnel )ASTM E18) ................................................ <br />$ <br />65 <br />R715Hardness <br />Test of Nuts, ............ ............................................................................. <br />$ <br />75 <br />R716Hardness <br />Test of Bolts ............. ...... ................ ........... ........ ..............�.....�.,.......,,.,, <br />$ <br />90 <br />R717 <br />Hardness Test of Washers................................................................................... <br />$ <br />75 <br />Concrete Corina Services <br />Cost (per test) <br />C423 <br />Equipment Concrete (4 and 8 hour minimum), per hour .................................... <br />$ <br />190 <br />Individual Core Prices (all prices are for a Four core minimum job): <br />C424 <br />Slab on Grade Coring for 2 ,3 and 4 Diameter (first 6 depth) each <br />$ <br />60 <br />C425 <br />Slab on Grade Coring for 6 and 8 Diameter (first 6 depth) each <br />..... $ <br />65 <br />C426 <br />Slab on Grade Concrete Core (price per inch after 6 depth),.,.........,, <br />$ <br />5 <br />C427 <br />Wall Cores 2 ,3 and 4 (first 6 in depth) each .................................. <br />$ <br />75 <br />C428 <br />Wall Concrete Core (price per inch after 6 in depth), per inch.......... <br />$ <br />5 <br />(Wall core pries based on Contractor supplying access to area to be <br />cored) <br />Miscellaneous Concrete Coring Prices: <br />C429 <br />Patching Slab on Grade Cored Holes with 2500 psi Concrete Patch, <br />each.................................................................................................. <br />.... $ <br />10 <br />C4.30 <br />Thickness Determination per ASTMI'C42, Bach .......................... .......... <br />$ <br />10 <br />C431 <br />Compression Strength Determination.....................................,........... <br />$ <br />55 <br />Asphalt Concrete Coring Services <br />Cost (per rest] <br />Alternate Individual Core Prices (all prices are for a four core minimum job): <br />A661 <br />- Asphaltic Concrete Cores 2 ,3 and 4 Diameter (First 6 in depth), <br />each..................................................................................................... <br />$ <br />60 <br />A662 <br />Asphaltic Concrete Cores 6 and 8 Diameter (First 6 in depth), <br />each................................................................................................... <br />$ <br />60 <br />A663 <br />Asphaltic Concrete Cores price per Inch after 6 in depth, each,......,.. <br />$ <br />5 <br />Miscellaneous Asphaltic Coring Prices: <br />A664 <br />Patching of Core Drilled Holes Using Cold Patch Material, each ......... <br />$ <br />25 <br />A665 <br />Thickness Determination per ASTM C42, each......... .............. --........ <br />$ <br />25 <br />A666 <br />Specific Gravity for Determination of Percent Compaction per <br />ASTM D 2726, each............................................................................ <br />$ <br />35 <br />A667 <br />Specific Gravity for Determination of Percent Compaction by <br />paraffin, each ........................ .......... ............... ......... .... ..... .......—........ <br />$ <br />55 <br />Page 5 of 5 <br />25N-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.