Laserfiche WebLink
&UNITED <br />dNSP.LtY "l7ClN aSr i <br />'".._. <br />MASTER FEE SCHEDULE <br />CITY OF SANTA ANA <br />GEOTECHNICAL, SPECIAL INSPECTION & MATERIAL TESTING SERVICES <br />Work from 4-8 hours <br />Work over 8 hours per day, or on Saturdays <br />Work over 12 hours per day <br />Work on Sundays/Holidays <br />Swing or Graveyard Shift Premium <br />Show -U p Tlme <br />Premium Sample Pick -Up (after 4 PM, before 5 AM, Weekends and Holidays) <br />la boratory Testing - Rush Fee <br />Outside Services/Reimbursables <br />Shipping Charges <br />Parking/Tolls <br />Certified Payroll Compliance <br />Deputy Inspectors <br />Travel Time (Beyond 100 -Mile Radius of Project Site) <br />Per -diem, Including Lodging (Beyond 100 -Mlle Radius) <br />Nuclear Gauge Dally Fee <br />8 -Hour Mlnimum Billing <br />Time and One -Half <br />Double Time <br />Double Time <br />$ 10.00 Hour <br />2 -Hour Minimum Billing <br />2 Times Sample Pick -Up Rate <br />Add 500% to Testi ng Cost <br />Cost + 10% <br />Cost + 10% <br />At Cost <br />S 75.00 Week <br />$ 50.00 Hour <br />Quotation on Request <br />$ 45,00 Day <br />Yearly escalation In Prevailing Wage hourly rates will be calculated using the percentage of Increase Issued by the State of <br />California Director of Industrial Relations. <br />25N-73 <br />Roof Sample Ply Count Asphalt ASTM D2829 <br />$ <br />132.00 <br />Each <br />Roof Sample Unit Weight ASTM D2829 <br />$ <br />49.00 <br />Each <br />ZEN ====IN=; OMMMMMMMMIMM <br />Fireproofing Adhesion/ Cohesion Test Kit ASTM E 736 <br />$ <br />45.00 <br />Each <br />Fireproofing Density Test ASTM E 605 <br />$ <br />35.00 <br />Each <br />Preparatlon of WPS, PQR, or Welder Certificate <br />$ <br />125,00 <br />each <br />Welder Qualifications <br />$ <br />150.00 <br />each <br />Weld Procedure Review <br />$ <br />200.00 <br />each <br />Sample Plck-Up _ <br />$ <br />40.00 <br />Hour <br />Geotechnical Charges <br />Vehicle Charges (Over 40 -Mile Radius) <br />Truck, 2 -Wheel Drive <br />$ <br />0.50 <br />mile <br />Truck, 4 -Wheel Drive <br />$ <br />0.60 <br />mile <br />All Other Direct Project Expenses (such as contract drilling and backhoe services, <br />Cost <br />+15% <br />special equipment rental, commercial travel, protective clothing, shipping, etc.) <br />Clerical Services <br />$ <br />75.00 <br />hour <br />Worlc from 0-4 hours <br />4 -Hour Minimum <br />Billing <br />Work from 4-8 hours <br />Work over 8 hours per day, or on Saturdays <br />Work over 12 hours per day <br />Work on Sundays/Holidays <br />Swing or Graveyard Shift Premium <br />Show -U p Tlme <br />Premium Sample Pick -Up (after 4 PM, before 5 AM, Weekends and Holidays) <br />la boratory Testing - Rush Fee <br />Outside Services/Reimbursables <br />Shipping Charges <br />Parking/Tolls <br />Certified Payroll Compliance <br />Deputy Inspectors <br />Travel Time (Beyond 100 -Mile Radius of Project Site) <br />Per -diem, Including Lodging (Beyond 100 -Mlle Radius) <br />Nuclear Gauge Dally Fee <br />8 -Hour Mlnimum Billing <br />Time and One -Half <br />Double Time <br />Double Time <br />$ 10.00 Hour <br />2 -Hour Minimum Billing <br />2 Times Sample Pick -Up Rate <br />Add 500% to Testi ng Cost <br />Cost + 10% <br />Cost + 10% <br />At Cost <br />S 75.00 Week <br />$ 50.00 Hour <br />Quotation on Request <br />$ 45,00 Day <br />Yearly escalation In Prevailing Wage hourly rates will be calculated using the percentage of Increase Issued by the State of <br />California Director of Industrial Relations. <br />25N-73 <br />