My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO BRISTOL ST PROJ PHASE 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
55B - RESO BRISTOL ST PROJ PHASE 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 2:25:56 PM
Creation date
5/3/2016 2:20:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. THE REGIONAL AND SPECIFIC LOCATION OF THE PROJECT <br />REGIONAL SETTING <br />The Project is located in between three US Highways the 5, 22 and 55 in Orange County. <br />PROJECT AREA DESCRIPTION <br />The improvements of Bristol Street from Warner Avenue to Saint Andrew Place will accommodate the west <br />side of Bristol, to align with a previously widened section. Improving Bristol Street Corridor will benefit the <br />City greatly, since it is currently designated as a Major Arterial Highway in Orange County and serves as a <br />vital north -south transportation link which has regional as well as local significance. The roadway <br />implement complete street features by providing safe mobility for all users. <br />Page 12 <br />RELOCATION PLAN <br />Bristol Street Phase 4 Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.