Laserfiche WebLink
budget percent, weekly ET, percent of ET programmed, a detailed description of system <br />deficiencies and schedule of repairs; and, 7) "green waste" recycling report. <br />The information contained in the above referenced documents shall be updated with any <br />new information as changes occur. The Director's Representative shall be immediately <br />notified of any changes to the above information. <br />Failure to submit a report by the first of each month shall result in a fine of $100.00 per <br />day for each report submitted late. <br />11.0 WATER CONSERVATION & PROGRAMMING OF CONTROLLERS <br />11.1 The City shall be responsible for programming irrigation controllers and conserving <br />water, The Contractor shall be responsible for all repairs and performing the weekly <br />visible irrigation checks and the providing a monthly written irrigation test report by <br />park/controller /station. <br />12.0 SPECIFICATIONS INTERPRETATION <br />12.1 The intent of these specifications is known by the City of Santa Ana and SAPRF. Any <br />questions relating to the interpretation of these specifications must be addressed, in <br />writing, prior to the start of work. The Contractor agrees that interpretations of this <br />contract after the start of work are at the sole discretion of the Director's Representative, <br />and the Contractor shall abide by all such interpretations <br />1.3.0 PROTECTION OF EXISTING FACILITIES AND STRUCTURES <br />13.1 The Contractor shall exercise due care in protecting from damage all existing facilities, <br />structures, and utilities, both above surface and underground on the City's property. Any <br />damage to City, Santa Ana Park and Recreation Facilities (SAPRF), or private property <br />caused by the Contractor's neglect shall be corrected and paid for by the Contractor at no <br />cost to the City of Santa Ana, or SAPRF. The City of Santa Ana and /or Director's <br />Representative shall make the determination of fault. The Director's Representative <br />reserves the right to issue a Stop Work Notice if the Contractor does not promptly repair <br />any damage, within twenty -four (24) hours of the damage incurred. <br />13.2 If the Directors Representative requests or directs the Contractor to perform work in a <br />given area, it will be the Contractor's responsibility to verify and locate any underground. <br />systems (i.e. utility lines) and take responsibility for taking reasonable precaution when <br />working in these areas. <br />13.3 Contractor shall call Undorground Alert (800) 422 - 4.133) at least two working days prior <br />to digging for line locations, Any damage or problems shall be reported immediately to <br />the Director's Representative and the City of Santa Ana If the Contractor discovers <br />something unexpected or a unique problem occurs, he should stop work and immediately <br />contact an authorized Director's Representative for a timely resolution of the problem. <br />