My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />III <br />M11111111111111 0 1011 A • ►_ <br />CITY COUNCIL MEETING DATE: <br />MAY 17, 2016 <br />TITLE: <br />AWARD CONTRACT TO KANA PIPELINE, <br />INC. FOR WARNER INDUSTRIAL <br />COMMUNITY WATER AND SEWER <br />IMPROVEMENTS (PROJECT 16 -6461) <br />{STRATEGIC PLAN NO. 6, 1C} <br />CITY MARTMR <br />' x!_11 11 ..:: 1, ! ■ <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1" Reading <br />❑ Ordinance on 2ntl Reading <br />❑ implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />Authorize the City Manager and Clerk of the Council to award and execute a construction <br />contract to Kane Pipeline, Inc., the lowest responsible bidder, in accordance with the bid in <br />the amount of $3,457,000, for the term beginning upon execution of the contract and ending <br />upon project completion, for the construction of the Warner Industrial Community Water and <br />sewer Improvements Project, subject to nonsubstantive changes approved by the City <br />Manager and City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated project delivery cost of $4,494,100, <br />which includes the contract base amount, administration, inspection, testing, and a $516,550 <br />contingency. <br />DISCUSSION <br />The existing 6 -inch diameter cast iron water main located within the Warner Industrial Community <br />(Exhibit 1) was installed in the 1950's and has begun to experience a number of significant <br />breaks and leaks. Staff monitors the condition of water main pipelines by assessing critical <br />factors such as history of breaks, size, location, and system redundancy to determine the <br />replacement priorities, Based on an analysis of these factors, both the water main and sewer <br />within this Industrial community have been identified for replacement, The Improvements Include <br />the construction of a new 6" P,V.C, water main, fire hydrants, water services and appurtenances. <br />Additionally, the sewer main system Is undersized and will be replaced with a new 10" vitrified <br />clay pipe (VCP). Once this project is completed, water service quality and reliability will Improve <br />significantly. The water main breaks and the possibility of a loss of service will be substantially <br />reduced. In addition, the upgraded sewer main system will provide larger flow capacity to prevent <br />overflow issues. <br />23B -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.