My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 16 -6461 <br />WARNER INDUSTRIAL COMMUNITY WATER AND SEWER IMPROVEMENTS <br />41. ** <br />Imported Backfill Material <br />(As Needed) <br />CY <br />200 <br />$'° <br />$�} <br />42 ** <br />Additional Potholing (As <br />EA <br />10 <br />$J` �— <br />Needed) <br />_/! <br />TOTAL BID <br />$ �I 71 000 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right <br />to award the Base Bid, and any, all, or none of the add - alternate bid items (if any). <br />Each mobilization item is limited to a maximum of 2.5% of the Total Bid. <br />** The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25 %" limit as stated in Section 3 -2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />jBidder signature must be shown on same page as total bid amount shown on table) <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within one hundred seventy -five (17 5) working days after the commencement date stated in <br />the Notice to Proceed. <br />25 –Working days for exploratory potholing and data gathering <br />150–Working days for project construction <br />The bidder also proposes to commence construction of the Work within thirty (30) days after issuance <br />of a Notice to Proceed, and to continue in a diligent and workman -like manner without interruption, <br />and to complete the construction thereof within the time specified above. <br />The liquidated damages amount in lieu of the amount specified in Subsection 6 -9 of the Standard <br />Specifications, shall be $2,000 per calendar day. <br />Name of Firm <br />Signature of BID[ <br />Title `– 'f_`ocl) G1 4 ( <br />(if an individual, so state) <br />P -4 OF P -17 <br />23B -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.