My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A, Pulldo <br />MAYOR PRO 1EM <br />V10031te SMnr1lent0 <br />COUNCILMEM6ERS <br />Angallea Anazrua <br />P. Davlcl aerlavldes <br />MICI7sle Martlnaz <br />Roman Reyna <br />Sal Tinaloro <br />April 12, 2016 <br />ADDENDUM TWO <br />CITY OF SANTA ANNA <br />20 Chia Center Plaza o P.0 Box 1986 M,30 <br />Santa Ana, Callt'ornle ;77472 <br />(714) Cr47 -6013 <br />wwww.santa•ann.oi <br />UPTPlCtAi- 6r ur:,�' 7 1l.A.L <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Carvalno <br />CLLRK OF THE COUNCIL <br />Marla D. Holzer <br />SUBJECT: PROJECT NO. 16.6461: WARNER INDUSTRIAL. COMMUNITY WATER <br />AND SEWER IMPROVEMENTS <br />The following changes /clarifications have been made to the specifications of the subject project. <br />1. TABLE OF CONTENTS <br />.M <br />7•,10 PUBLIC CONVENIENCE AND SAFETY <br />7- 10,1,2 Outreach Program & Coordination <br />In addition to the standard notices, the contractor will be required to create and Implement <br />an Outreach Program that consists ofthefollowing items t'hatwill be required prior to <br />commencement of construction. <br />m Assign or hire an Outreach Coordinator /Spokesperson and provide; Name, title, <br />phone number, and ernall. This person should be available during and after working <br />hours. <br />P Provide business Coordination Logs (sample). These logs will need to Include the <br />business name, address, person contacted, date of contact, Purpose (sample) and <br />preferred days/timas for construction to minimize impacts. it is the contractor's <br />responsibility to contact all businesses within the project limits, inform them of the <br />construction activities, and determine the times for construction that will minimize <br />impacts to access and public inconvenience, These efforts shall be coordinated with <br />the City Engineer or his representative to minimize businesses disruptions. The <br />Inspector will verify coordination efforts on a regular basis. <br />SANTA ANA CITY COUNCIL <br />N119wil A. Pdko I viawto Harlylk"ln MchelaMoNnwa Mgellao Ammeci* I P. Y)aNdidenxvlaex IRomakayon SaA'rinetoro <br />Mayor Moyar I'm renr worn I Word 2 Word x Wor<r4 Wrvrd A Werda <br />^14'11 IhMliAA- 413.4!a I ervlr -lave i in.u.e I ala- BID £ nutvasn 2M21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.