My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: ICana Project# 5162 — Sewer Replacement and Road Reconstruction <br />Location: Chapman Ave., Fullerton, CA <br />Description: Removing and replacing old sewer pipeline mainlines with new sewer main <br />for the City of Fullerton, along Chapman Ave and nearby side streets amidst <br />residential neiehborhood. Installed approximately 4,000 LF of 8" VCP <br />Sewer Main installation; 150 LF of 8" Ductile Iron Sewer Main, sewer <br />manholes, lateral reconnections, removed existing VCP sewer main <br />pipeline, manholes, and sewer cleanouts; installed an Access Ramp per <br />APWA and access ramp retrofit; installed now sidewalk, curb a gutter and <br />cross gutters, alley returns, aggregate base, asphalt concrete, adjusted sewer <br />manholes and water valves to grade; installed street light conduit; carried <br />out Water Pollution Control, Traffic Control, Clear and Grub, Sheeting, <br />Shoring and Bracing. Note, This was a 100% import and 100% export <br />material soil project. <br />Total Man- hours: 5,733 <br />Owner: City of Fullerton, 303 W. Commonwealth Ave., Rm # 207, <br />Fullerton, CA 92832 <br />Proiect Manager: Eric Villagracia, (714) 738 -6853 <br />Contract Amount: $1,415,119.45 <br />Start Date: 5/23/2011 <br />Date Of Completion: 9/15/2011 <br />Kana Pipeline Public Works Resume [Confidential] /Page 10 0£25 as of 1/2015, <br />23B -41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.