My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Exhibit 2 <br />PROPOSAL <br />PROJECT NO. 16 -6461 <br />WARNER INDUSTRIAL COMMUNITY WATER AND SEWER IMPROVEMENTS <br />RID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish <br />all material and do all the work required to complete the said work in accordance with said plans (if <br />any) and the specifications for the unit price(s) or lump sums) set forth in the following schedule: <br />WATER MAIN IMPROVEMENTS <br />Item <br />Bid Item <br />Unit <br />City <br />Unit Price <br />Amount <br />1.* <br />Mobilization —Water <br />L5 <br />1 <br />$ 7 <br />$) <br />Main Improvements_ <br />2 <br />8" DR14 AWWA C900 <br />LF <br />9,120 <br />$ )o > p <br />$9>76co'7 <br />P.V.C. Water Main <br />- - -i- <br />Construct 1" Water <br />00 <br />o <br />3. <br />Service and Connect to <br />EA <br />35 <br />Existing Meter <br />Construct 2" Water <br />0 <br />4. <br />Service and Connect to <br />EA <br />60 <br />Existing Meter <br />Construct 3" Water' <br />20 <br />00 <br />5- <br />Service and Connect to <br />EA <br />2 <br />$ 5,760 <br />$ t, � <br />Existing Meter <br />6. <br />8" Resilient Wedge Gate <br />EA <br />11 <br />q <br />"— <br />Valve <br />Fire Hydrant Assembly <br />7. <br />(includes gate valve and <br />EA <br />18 <br />$ <br />_ <br />lateral pipe) <br />Construct 6" Fire Service <br />as <br />ck <br />8. <br />and Connect to Existing <br />EA <br />30 <br />Piping <br />Construct 8" Fire Service <br />00 <br />00 <br />9. <br />and Connect to Existing <br />EA <br />9 <br />$ { -- <br />__ <br />�— <br />Piping <br />P -1 OF P -17 <br />23B -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.