My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - MATER DEI UPDATE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
65B - MATER DEI UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 5:46:59 PM
Creation date
5/13/2016 8:51:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Manager's Office
Item #
65B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No other dedications of land will be required by City in connection with the Development <br />during the Term. However, nothing herein shall be construed to limit City's ability to acquire <br />any portion of the Property, or rights therein, through the exercise of its power of eminent <br />domain. <br />(b) The parking structure, the new Performing Arts Center and other on -site <br />building improvements are to be completed by Developer at Developer's sole cost and expense <br />as generally described in the Site and Development Plan. Those off -site improvements described <br />in subsections 7(b)(i) and (iv) below shall also be completed by Developer at its sole cost and <br />expense. Those off -site improvements described in subsections 7(b)(ii), (iii) and (v) below shall <br />be completed by City at City's sole cost and expense: <br />(i) Installation of a traffic signal and crosswalk at Bristol Street and <br />St. Andrew Place, phis a dedicated right -turn lane along westbound <br />St. Andrew Place at Bristol Street; <br />(ii) Completion of abandonment and associated utility relocations for <br />Baker Street, Berkeley Street and Occidental Street, keeping an <br />opening between Berkeley Street and Occidental Street as a public <br />alley; <br />(iii) Completion of drainage improvements and storm drains; <br />(iv) Modification of a four -way stop at the intersection of St. Andrew <br />Place and Baker Street; and <br />(v) Updated left -turn signal timing at the Edinger Avenue and <br />Monarch Way intersection for entry into the Mater Dei campus. <br />11. Street Vacations, Utility Relocations and Related Improvement Work. <br />City shall, at its sole cost and expense, vacate and abandon City's right of way easements <br />over Balser Street, Berkeley Street, Occidental Street and St. Andrew Place, to the extent they are <br />included on or about Additional Parcel No. 4, as shown in Exhibit 8 attached hereto and <br />incorporated herein by this reference. City shall, at its sole cost and expense, remove street <br />improvements from all vacated streets and construct public drainage improvements in the area of <br />the drainage easement granted to City by Developer pursuant to Section 7 hereof, in accordance <br />with the following terms and conditions: <br />(a) The street removal and drainage improvement work described above shall <br />all be completed by City prior to the last of the following dates: <br />(i) The date occurring one (1) year after the date on which City <br />receives written notice from Developer that Developer has <br />acquired title to all the Additional Parcels (provided Developer has <br />in fact acquired such title); <br />SMAI {:475724784.2 656-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.