My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2016-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
FULL PACKET_2016-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 4:55:44 PM
Creation date
5/13/2016 4:53:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/17/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1058
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A�:... <br />At=7Kana Pipeline, Inc. <br />Proiect Name: Kana Project 4 5212 — Concrete Street Water Pipeline Improvements Santa <br />Ana <br />Location: Various streets throughout Santa Ana, CA <br />Description: Karla Pipeline installed several thousand feet of water pipeline main and <br />related infrastructures along Concrete Street in various locations.Over 6,000 <br />LF 8" and 12" PVC C900 water main pipeline, 1" & 2" water services, <br />resilient wedge gate valves, a fire line main and lateral with new fire hydrant <br />assemblies, and hot taps; traffic control and pavement markings; cold mill <br />and asphalt pavement overlays /grind and cap. <br />Total Man - hours: 5,792 <br />Owner: City of Santa Ana <br />Project Manager: Edward Torres, Project Manager of Construction (714) 647 — 5018 / <br />etorres@santa- ana•org <br />Contract Amount: $ 723,755.00 <br />Start Date: 07/11/2011 <br />Date Of Completion: 3/23/2012 <br />Kana Pipeline Public Works Resume [Confidential] /Page 12 of 25 as of 1/2015. <br />23B -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.