My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICROSFT POWERPOINT - WORKSTUDYSESSION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
MICROSFT POWERPOINT - WORKSTUDYSESSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2016 4:39:47 PM
Creation date
5/17/2016 4:39:41 PM
Metadata
Fields
Template:
City Clerk
Agency
Finance & Management Services
Doc #
WSA
Date
5/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC <br />IMPROVEMENTS <br />$5,403,400 <br />PlanningTraffic SignalMobility/Safety <br />OC Street Car <br />3 –Projects4 –Projects9 –Projects <br />$150,000$1,246,000$3,007,400$1,000,000 <br />Bike Lane Project Bike Lane Project <br />•• <br />Fairview St Traffic Signal Fairview St Traffic Signal Citywide Safe Routes to Citywide Safe Routes to Continue partnership with Continue partnership with <br />•••• <br />•• <br />DevelopmentDevelopment <br />SynchronizationSynchronizationSchoolSchoolOCTAOCTA <br />Traffic Traffic Management PlansManagement Plans <br />•• <br />Traffic Signal Hardware Traffic Signal Hardware Sepulveda Safe routes to Sepulveda Safe routes to Design OversightDesign Oversight <br />•••• <br />•• <br />Traffic Safety Project Traffic Safety Project <br />•• <br />UpgradeUpgradeSchoolSchool <br />DevelopmentDevelopment <br />thth <br />Westminster Ave/17Westminster Ave/17St St Civic Center Drive Bike Civic Center Drive Bike <br />•• <br />•• <br />Corridor Traffic Signal Corridor Traffic Signal BoulevardBoulevard <br />Synchronization Synchronization EdingerEdingerAve, Santa Ana Ave, Santa Ana <br />•• <br />thth <br />Euclid St and Hazard Euclid St and Hazard Blvd, and 5Blvd, and 5St Protected St Protected <br />•• <br />Ave Signal ModificationAve Signal ModificationBike LanesBike Lanes <br />Warner and Flower Warner and Flower Crosswalk Upgrades Crosswalk Upgrades --PhPhIIII <br />•• <br />•• <br />Intersection ImprovementIntersection ImprovementFlower Street Safety Flower Street Safety <br />•• <br />enhancementsenhancements <br />Lincoln Pedestrian TrailLincoln Pedestrian Trail <br />•• <br />FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT <br />35 <br />SMSA ImprovementsSMSA Improvements <br />PROGRAM <br />•• <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.