My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENTERPRISE AUTOMATION INC.-2016
Clerk
>
Contracts / Agreements
>
E
>
ENTERPRISE AUTOMATION INC.-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:11:11 PM
Creation date
5/31/2016 11:21:38 AM
Metadata
Fields
Template:
Contracts
Company Name
ENTERPRISE AUTOMATION INC.
Contract #
A-2016-011
Agency
PUBLIC WORKS
Council Approval Date
1/19/2016
Expiration Date
1/31/2019
Insurance Exp Date
11/13/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+100MATION <br />NTERPRISE Enterprise Automation <br />ENTERPRISE p 210 Goddard Irvine CA 92616 USA <br />Tel 949-769-6000 Fax 949-769-6005 <br />wwwalntaetrator carte <br />Nothing Leaves Enterprise Untested. <br />4,9,3 i SMI Standards <br />EA will also develop and document the following HMI screen standards for the field <br />based HMI panels (Dynac excluded) based on outcomes of the site operations <br />workshops performed early in the project: <br />1. Basic screen template (Incl navigation methods <br />2. Screen layout guidelines <br />3. Pop -ups <br />4. Icons for equipment <br />5. Color standards <br />6. Screen navigation flow <br />7. User input (via mouse, keypad, touch) <br />8. Communications protocols <br />9. Alarm logs <br />10. Event logs <br />11. Trend layouts <br />12. Tag numbering <br />13. Equipment descriptions <br />Once complete, EA will submit the standards to the City for review. <br />To ensure the City's complete understanding of the standards, EA will conduct a half <br />day workshop with the City to review, explain, and discuss the contents as necessary. <br />We believe that the City's understanding of the standards will be rapidly advanced by <br />this additional workshop. [This is additional scope added by EA]. <br />Fallowing the workshop and receipt of the City's review comments, EA will update the <br />documentation per City comments, <br />It is likely, and more to the point beneficial that the PCS Integrator will need training on <br />the use of these standards, however EA has not provided for this scope. <br />4.10 -needed Operational and Programming ming Support <br />As per the RFP scope, EA has provided an allowance of 60 hours to assist the City <br />with misc operational and programming support for any City facility on an as -needed <br />basis. <br />Revision: 1.00 Paye Numbor: 10 cat 11 <br />t ilanan e. EA 15SSA086 SCOPE wamut putnp (stagon (O(J <br />
The URL can be used to link to this page
Your browser does not support the video tag.