Laserfiche WebLink
City of Santa Ana <br />Walnut Pump Station <br />EAI5SSA085 <br />bate: 4th November 2015 <br />Version: 1.00 <br />Author. Scott Pickford <br />Reviewed by: Josh Riley <br />ENGI S -is Audit <br />FAI55SA083 ESTIMATE Walnut pump station 100 ENG1 SHB AudH 3&20 <br />lnois�-..WtaFofic:..: <br />'. Hwis <br />Pr fla <br />Segiof <br />LAaO-.�- <br />PN. <br />-'.. �fvcfiltent <br />.P-'eC <br />Senor <br />13 <br />$2,285 <br />20 <br />$3 380 <br />Desaiorgn <br />$16',00 <br />5775.00 <br />St85.00 <br />5185.00 <br />5200.00 <br />$16500 <br />$175.00 <br />$185.00 <br />$185.00 <br />5200.00 <br />Sig inspection <br /><hours az estimated by the City, amel Sours may vane <br />inspect f aV with City staff(day 1) <br />$ <br />8 <br />inspect racTty Vith Chy staff (day 2) <br />$ <br />8 <br />Site audit tochnicat memorandum <br />catalog existing controls harda,re <br />8 <br />2 <br />prepare technical memorandum <br />24 <br />12 <br />2 <br />evaluation of Condition of wasting aulomaiAn equipment <br />recommendauon of enhancements to existing controls <br />rec0mmanda6ons W standardize controls hardvrare <br />Site audit technical memorandum submittal <br />mmo9e and submit <br />1 <br />review submittal vrith the City (half day Workshop) <br />A <br />updates per City comments <br />6 <br />2 <br />instrumoot database <br />prepare instrument database(Excel fomtet) <br />16 <br />4 <br />design the format and Seld structure with the city <br />Instrument database sub. his] <br />comol=and submit <br />1 <br />updates per City commems <br />2 <br />1 <br />UO and cordumm ations database (Excel fauna[) <br />preparesllO and communications database <br />24 <br />4 <br />design the format and field structure with the city <br />110 and cornmunimHOns database submittal <br />connote and submit <br />1 <br />updates per City comments <br />A <br />2 <br />FAI55SA083 ESTIMATE Walnut pump station 100 ENG1 SHB AudH 3&20 <br />'. Hwis <br />.Pile' - <br />32 <br />$5,750 <br />48 <br />$8170 <br />13 <br />$2,285 <br />20 <br />$3 380 <br />4 <br />$680 <br />28 <br />$4,700 <br />7 <br />$ti35 <br />FAI55SA083 ESTIMATE Walnut pump station 100 ENG1 SHB AudH 3&20 <br />