SCOPE OF WORT{ AND SCHEDULE <br />Development of Alternative Rehabilitation Plans <br />Dudek will develop three (3) preliminary lake rehabilitation plan alternatives. Development of the <br />alternatives will be based upon the findings of the lake research effort, soil analyses and testing, <br />water quality testing, condition of existing pump equipment/facilities, and input on preferences from <br />the City. The variation in the alternatives will reflect different approaches to meet the same identified <br />project goals. Major physical, design, and permitting constraints will be identified for each <br />alternative. A conceptual exhibit and narrative description will be prepared to present each <br />alternative to the City for input from the City and guidance and selection of the preferred alternative. <br />Deliverable: Three (3) alternative Lake Rehabilitation Plan Exhibits, narrative description of major <br />plan elements, order of magnitude cost estimate for each plan <br />Lake Aeration System Preliminary Sizing and Design <br />Dudek will preliminarily size, design, and layout an aeration system to obtain optimum oxygen <br />saturation in the lake. An exhibit will be prepared showing the preliminary sizing of major equipment <br />and location of the aeration pods/discs. The aeration system fluid dynamics/sizing calculations will <br />be provided in the report appendices. <br />Deliverable: Lake aeration sizing calculation results (included in study report) and exhibit showing <br />recommended aeration system components and location, preliminary partial specifications for <br />recommended components <br />Preliminary Lake Circulation System Pump Station Design and <br />Plumbing System Design <br />Dudek will preliminarily size, design, and layout the lake circulation system including the pump <br />vaults/stations and associated equipment. The goal of the system is to provide efficient and cost <br />effective circulation and a sufficient lake turnover rate to maintain optimal water quality in the lake. <br />An exhibit will be prepared showing the preliminary sizing of major equipment (pumps, motors, <br />valves, piping, etc.) and location of the circulation system components. Dudek will also provide an <br />analysis of the expected yearly energy consumption of the circulation pumps. The calculated cost <br />will be provided in the report showing operational costs of the lake. The circulation system <br />hydraulics/sizing calculations and preliminary pump sizing calculations will be provided in the report <br />appendices. <br />Deliverable: Lake circulation pump and pipe sizing calculation results (included in study report) and <br />exhibit showing recommended circulation system components and location, partial preliminary <br />specifications for recommended components <br />Lake Liner System Design <br />Perform a water balance analysis for the lake system which includes the irrigation demands for the <br />project to determine the total water requirements. Water demand analysis will evaluate water <br />demands on a monthly basis for a total year period. A simplified water balance will be prepared that <br />analyzes all the water inputs and withdrawals to determine the amount of "makeup water" required <br />for the lake operation, as well as irrigation demands. The water entering from the project will include <br />both nuisance and stormwater runoff. The analysis will evaluate both average year and dry year <br />conditions. <br />The soil analysis results will be used to develop design recommendations for rehabilitation of the <br />lake liner as determined from the water balance/seepage loss calculations and the soil grain size <br />and chemistry analyses. Lake liner options that will be considered will include but, is not limited to: <br />DUDEK Centennial Park Lake Circulation and Aeration Study 12 <br />