My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUDEK, INC. - 2016
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
DUDEK, INC. - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2017 4:08:19 PM
Creation date
6/1/2016 10:55:10 AM
Metadata
Fields
Template:
Contracts
Company Name
DUDEK, INC.
Contract #
A-2016-072
Agency
PUBLIC WORKS
Council Approval Date
4/19/2016
Expiration Date
4/19/2017
Insurance Exp Date
8/28/2017
Destruction Year
2022
Notes
Amended by A-2016-072-01
Document Relationships
DUDEK, INC. 1- 2016
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK AND SCHEDULE <br />on measures that may be necessary or beneficial to the City such as pre -project air quality <br />monitoring to overcome any project protests in order to comply with the applicable CEQA laws for <br />rehabilitation of the Lake. <br />Deliverable: CEQA notice of exemption filed with County of Orange, narrative guidelines and <br />advice regarding CEQA compliance steps for the project (included in study report) <br />Preliminary Resource Agency Guidance <br />Based upon our recent experience with permitting similar community lakes and our familiarity with <br />the project area it is anticipated that the project will be exempt from regulatory permits (401, 404; <br />16000, etc.) and there are no protected species in the vicinity of the project. However, it may be <br />necessary to notify the resource agencies (SWRCB, USACOE, CDFW) of the project. Dudek will <br />provide official notification to the agencies on behalf of the City. Dudek will also provide <br />recommendations for the course of action to be taken by the City in the event that the selected Lake <br />Rehabilitation Plan does require a resource agency permit and/or if protected species are identified <br />in the vicinity of the project. <br />Deliverable: Narrative guidelines and advice regarding Resource Agency compliance steps for the <br />project (included in study report) <br />Lake Rehabilitation Study Report <br />Dudek will prepare a compilation report which will serve as the Lake Rehabilitation Study Report for <br />the proposed improvements to Centennial Park Lak. The report will include documentation of each <br />element of the lake study including: project background, project goals, City staff input, existing <br />facilities, identified constraints, alternative rehabilitation plans, the recommended rehabilitation plan, <br />preliminary design of each lake system (water quality, lake liner, aeration, circulation, water features, <br />fishery/wildlife enhancements, etc.), cost estimates, CEQA compliance and permitting, lake <br />management guidelines, and technical appendices. This document will serve to reference all <br />preliminary design assumptions, guidelines, and criteria developed during the preliminary design <br />process. The anticipated Table of Contents of the report is provided below: <br />• Executive Summary <br />• Background <br />• Project Goals and Objectives <br />• Existing Condition of Centennial Park Lake <br />• Identified Deficiencies <br />• Alternative Rehabilitation Plans <br />• Order of Magnitude Costs <br />• Rehabilitation Plan Selection <br />• Recommended Rehabilitation Plan <br />• Preliminary Design of Lake Systems <br />• CEQA Compliance <br />• Resource Agency Permitting <br />• Engineer's Opinion of Probable Construction Costs <br />• Phased Implementation Plan <br />• Lake Management <br />DUDEK Centennial Park Lake Circulation and Aeration Study 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.