My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - CONSTRUCTABILITY REVIEW SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/07/2016
>
25C - AGMT - CONSTRUCTABILITY REVIEW SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 4:32:13 PM
Creation date
6/2/2016 2:45:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/7/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHIBIT 10 -11 <br />Sample Cost Proposal <br />(EXHIBIT 10 -14 SAMPLE COST PROPOSAL (EXAMPLE 43) <br />COST PER UNIT' OF WORT{ CONTRACTS <br />(GEOTECITNICAL AND MATERIAL TESTING) <br />Note: Mark -ups are Not Allowed <br />Consultant KPFF ContraetNo. Date 3 /15/16 <br />Page — of <br />Unit/item of Work: <br />(Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material Study) <br />Include as many Items as necessary. <br />DIRECT LABOR Hours Hourly Total ($) <br />Billing <br />Rate ($) <br />Professional (Classification) $ 0.00 <br />Sub- piofessional/Tecbnical* $ 0.00 <br />EQUIPMENT (with Operator) <br />OTHER DIRECT COST <br />$ 0.00 <br />Description Unit(s) <br />Unit Cost <br />Mobilization/De- mobilization <br />$ <br />$ 0.00 <br />Supplies /Consutnables (Itemize) <br />$ <br />$ 0,00 <br />Travel /Mileage <br />$ <br />$ 0.00 <br />Report (if applicable) <br />$ <br />$ 0.00 <br />TOTAL COST PER UNIT OF WORT( <br />$ 0.00 <br />NOTES: <br />• Denote labor subject to prevailing wage with asterisk (0). <br />Hourly billing rates should include prevailing wage rates and be consistent with publicly advertised rates chargcd to all clients <br />(Commercial, Private or Public). <br />Hourly billing rates include hourly wage rate, net fee /profit, indirect cost rate, and actual direct equipment rate. <br />• Mobilization /De- mobilization is based on site location and number and frequency of tests /items, <br />• ODC items should be based on actual costs and supported by historical data and other documentation, <br />• ODC items that would be considered "tools of the made" ure not reimbursable. <br />LPP 15 -01 <br />25C -28 <br />Page 5 of S <br />January 14,201S <br />
The URL can be used to link to this page
Your browser does not support the video tag.