My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31D - CUP - 1666 N MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/07/2016
>
31D - CUP - 1666 N MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 4:36:48 PM
Creation date
6/2/2016 3:04:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31D
Date
6/7/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MLTA Housing — Santa Ana Arts Collective Parking Analysis <br />April 20, 2016 <br />Page 7 <br />Traffic Intensity Factor (T1F) Analysis (aka Traffic (Queue Study) <br />The following is a review of the traffic intensity of the proposed Meta Housing — Santa Ana Arts Collective <br />Parking Facility. <br />When designing a parking facility it is critical to consider the external traffic flow, internal traffic flow and the <br />ingress /egress control plazas. This will result in a parking facility that will provide the highest level of user <br />comfort and convenience. It is also critical to understand the TIF for the parking facility. This calculation <br />takes into consideration assumed peak -hour traffic volumes, along with ease of traffic flow which depends on <br />the type of parking operation It is, e.g, free parking, paid parking, short -term (shopping patrons /visitors) and <br />long -term parking (employees), etc. <br />The proper design of the vehicular ingress /egress control plazas ensures desirable traffic flow. Consideration <br />of the user - groups is important. For Instance, some facilities may not require gate - controlled access, whereby <br />traffic has a free -flow style. Other facilities may require gate controls to realize revenue potential or to <br />control user -type parking areas, e.g, residents, long- term/employee parking, nested parking areas, short- <br />term /visitor parking, etc. <br />Project Description <br />The Meta Housing — Santa Ana Arts Collective will be an affordable housing /adaptive re -use project that will <br />have one (1) van accessible space located at the Grade Level and 112 parking spaces in a one- level, <br />subterranean parking garage. Of these, ten (10) spaces will be reserved for visitors and three (3) spaces will <br />be reserved for employees. These thirteen (13) spaces will be located outside of the gated controls (see <br />Exhibit "A ") and will have free -flow vehicular ingress /egress. The residential parking will be located in a <br />reserved parking area that will have vehicular gate controls for ingress and egress. <br />The proposed vehicular access will be via one entrance gate and one exit gate. The gates will be traditional <br />sliding gates as are normally used in multi - family residential properties. These vehicular gates are proposed <br />to be controlled by typical garage door openers. The opening of these gates typically takes approximately five <br />to ten seconds. This is normally how gate - controlled entrances and exits function. High speed gates for this <br />type of project are cost prohibitive. <br />Specifically, this review will include confirmation that the vehicular access lanes will be adequate in regards to <br />the parking control service rate for the parking components of this affordable housing residential project. This <br />31 D -31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.