Laserfiche WebLink
MAYOR <br />Miguel A Puhdo <br />MAYOR PRO rEM <br />Vincente Sarnmento <br />COUNCILMEMBFIRS <br />Angelica Arnezwo <br />P. David Senavides <br />Michele Martinez <br />Roman Royna <br />Sal'rinajem <br />April 21, 2016 <br />ADDENDUM No. ONE <br />CIPT' OF SANTA ANA <br />PUBLIC WORKS AGENCY M-36 <br />P.O. Box 1988 <br />Santa Ana, California 92702 <br />SUBJECT: PROJECT No. 15-6843; SAFE TRANSIT STOPS <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R Carvalho <br />CLERK OF THE COUNCIL <br />Maria D Hurzar <br />The following changes have been made to the specifications of the subject project: <br />apgofications <br />1. Appendix H, Scope of Work, Contractor Responsibilities, Bullet Point 4: <br />Delete bullet point 4 "Contractor shall provide OCTA signage during construction, as shown <br />in Appendix E" <br />2, Appendix H, Concept Drawing Keyed Note #9. Revise note to read as follows: <br />"LED Strip Lighting: Install minimum one T-0" long strip per bay to provide minimum two (2) <br />footcandle light level around shelter, This level can be inclusive of existing nearby street <br />lighting. Light operation will be from dusk until down. " <br />3. Appendix H, Concept Drawing Keyed Note #12: Revise note to read as follows: <br />"Solar Panel, to power LED strip lighting. System shall have minimum 5 days autonomy, <br />shall be sized for the shortest day of the year, and shall be UL listed. " <br />4. Appendix H, Concept Drawing Keyed Note #14: Append to note the following: <br />"Lighting for Advertisement Case to be solar powered." <br />All other terms and conditions remain the same. <br />FOR TFIECITYP SAN�"AANA <br />Edwin "William" Galvez <br />City Engineer <br />Public Works Agency <br />23A-26 <br />