Laserfiche WebLink
MAYOR <br />Migual A. Purdo <br />MAYOR PRO TEM <br />Vincente Sarmlento <br />COUNCILMEMBERS <br />Angelica Amezcua <br />P. David Benavides <br />Michele Martinez <br />Roman Rayne <br />Sal TipajRro <br />April 21, 2016 <br />ADDENDUM No. ONE <br />l Y <br />01 <br />it <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M-36 <br />P.O. Box 1988 <br />Santa Ana, California 92.702 <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Gawalho <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />The following changes have been made to the specifications of the subject project: <br />Specifications <br />1. Appendix H, Scope of Work, Contractor Responsibilities, Bullet Point 4: <br />Delete bullet point 4 "Contractor shall provide OCTA signage during construction, as shown <br />in Appendix E" <br />2, Appendix H, Concept Drawing Keyed Note #91 Revise note to read as follows: <br />"LED Strip Lighting: Install noinimum one 3' -0" long strip per bay to provide minimum two (2) <br />Footcandle light level around shelter. This level can be inclusive of existing nearby street <br />lighting. Light operation will be from dusk until dawn." <br />3, Appendix H, Concept Drawing Keyed Note #12: Revise note to read as follows: <br />"Solar Panel, to power LED strip lighting. System shall have minimum 5 days autonomy, <br />shall be sized for the shortest day of the year, and shall be UL listed." <br />4, Appendix 11, Concept Drawing Keyed Note #14: Append to note the following: <br />"Lighting for Advertisement Case to be solar powered." <br />All other terms and conditions remain the same. <br />FOR THE SANTA ANA <br />r <br />Edwin "William" Galvez <br />City Engineer <br />Public Works Agency <br />23A-46 <br />