My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - ROADWAY IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
23A - PROJ - ROADWAY IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:44:25 AM
Creation date
6/16/2016 3:23:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/21/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL Exhibit 2 <br />PROJECT NO.: 16-6868 <br />WARNER INDUSTRIAL COMMUNITY PAVEMENT IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: R.J. NOBLE COMPANY <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the Work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation <br />�Concrete <br />—24,000 <br />—C�Y— <br />-T-2W-z S <br />$ <br />2 <br />Asphalt <br />—47,000 <br />. 5z <br />3 <br />PCC Cross Gutter (T=r) *--1,300 <br />-PCC —Curb <br />4- 1 <br />4 <br />Romp ;V-- <br />—* <br />-- <br />10,500 <br />SF <br />5 <br />PCC Driveway Approach (T=8") <br />—10,600 <br />SF <br />—j; o <br />7 7, 11 g <br />6 <br />PCC Sidewalk <br />7,300 <br />SF <br />1 1 <br />�Gutter <br />8 <br />PCC Longitudinal (T-8 --7200 <br />- E—F — <br />—$-- <br />"2, Cl, 1,; o <br />G". "t <br />9 <br />Root Shave <br />�Frame& <br />—40 <br />10 <br />Adjust Manhole Cover to <br />Finished Grade <br />-- <br />--100 <br />$ <br />ll <br />Furnish and Install New Water Valve <br />Frame & Cover to finished Grade <br />-Adjust —Grade <br />120 <br />-ffA---- <br />47) <br />4- T, <br />— <br />12 <br />------S <br />Pullbox—lo Finished <br />E—A—T$-�-,—,, <br />13 <br />Traffic Loops <br />',Sign— <br />—30" <br />EA <br />14 <br />Construction <br />--7 <br />23A--i7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.