My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />Project, potential short-term construction related adverse impacts to scenic vistas <br />at Centennial Park and at the Heritage Museum would be less than significant. <br />Alternative 4: Pipeline Design Alternative <br />Under Alternative 4, four injection wells would be constructed at Centennial Park <br />and above ground' monitoring well Would be constructed at the Heritage Museum. <br />Under Alternative 4, the water supply pipeline within Centennial Park would <br />extend through open space. The pipeline would be underground and would not <br />be visible to the public. Potential long term impacts to scenic vistas would be <br />similar to the level of impacts associated with the Proposed Project. No potential <br />long term adverse impacts to scenic vistas within Centennial Park or within <br />Heritage Museum would occur. <br />Construction activities associated with Alterative 4 would result in short-term <br />adverse scenic vista impacts at Centennial Park and at the Heritage Museum. <br />Because the water supply line would extend through open space areas at <br />Centennial Park there would be increased potential for the construction activities <br />to be visible to the public. Similar to Proposed Project, the potential view shed <br />scenic impacts would be for a short period of time and when construction <br />activities are completed existing views would be returned to their pre-project <br />condition. Potential adverse impacts to scenic vistas at Centennial Park and at <br />the Heritage Museum would be less than significant. <br />Mitigation Measures <br />No mitigation measures required. <br />Level of Impact after Mitigation <br />Alternative 1: No adverse impact <br />Alternative 2: Less than significant adverse impact <br />Alternative 3: Less than significant adverse impact <br />Alternative 4: Less than significant adverse impact <br />IMPACT AR-2- Would the project substantially degrade the existing visual <br />character or quality of the site and its surroundings? <br />Alternative 1: No Federal ActionlNo Project <br />Under Alternative 1, the project would not be implemented, Both Centennial Park <br />and the Heritage Museum would continue to operate as open space and cultural <br />resources. There would be no changes the existing visual character at <br />Centennial Park or at the Heritage Museum. <br />%11*,�.) Mid Basin Centennial Park Project Final EIR 5-11 <br />0 AtIO M <br />
The URL can be used to link to this page
Your browser does not support the video tag.