My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />Mitigation Measure <br />AR-11: Construction lighting fixtures will be shielded by providing side flap on <br />lights, or providing a temporary drape/wall so that illumination is confined to <br />within the work area. Onsite construction lighting will be arranged so that direct <br />rays will not shine in or produce glare impacts to sensitive receptors. <br />AR-2: If the onsite construction lighting creates a light or glare issues for <br />sensitive receptor properties, OCWD will implement corrective measures to <br />resolve the iissule. Such corrective measures may include providing additional <br />shielding on light fixtures, relocating lighting light fixtures or increasing, the height <br />of the temporary drape/wall. <br />Level of Impact after Mitigation <br />Alternative 1: No adverse impact <br />Alternative 2: Less than significant adverse impact with the implementation of <br />Mitigation Measures AR-1 and AR-2. <br />Alternative 1 Less than significant adverse impact with the implementation of <br />Mitigation Measures AR-1 and AR-2. <br />Alternative 4: Less than significant adverse impact with the implementation of <br />Mitigation Measures AR-1 and AR-2. <br />Mid Basin Centennial Park 2M&OM Project Final EIR 5-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.