Laserfiche WebLink
Section 5 <br />Mitigation Measure <br />AR-11: Construction lighting fixtures will be shielded by providing side flap on <br />lights, or providing a temporary drape/wall so that illumination is confined to <br />within the work area. Onsite construction lighting will be arranged so that direct <br />rays will not shine in or produce glare impacts to sensitive receptors. <br />AR-2: If the onsite construction lighting creates a light or glare issues for <br />sensitive receptor properties, OCWD will implement corrective measures to <br />resolve the iissule. Such corrective measures may include providing additional <br />shielding on light fixtures, relocating lighting light fixtures or increasing, the height <br />of the temporary drape/wall. <br />Level of Impact after Mitigation <br />Alternative 1: No adverse impact <br />Alternative 2: Less than significant adverse impact with the implementation of <br />Mitigation Measures AR-1 and AR-2. <br />Alternative 1 Less than significant adverse impact with the implementation of <br />Mitigation Measures AR-1 and AR-2. <br />Alternative 4: Less than significant adverse impact with the implementation of <br />Mitigation Measures AR-1 and AR-2. <br />Mid Basin Centennial Park 2M&OM Project Final EIR 5-15 <br />