My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />Table 25: Estimated Proposed Project Operational GHG Emissions <br />Activity <br />Well Development <br />Emissions (MTCO2e) <br />77 <br />Electrical Ener9Y <br />4 <br />Total <br />81 <br />SCAQMD CEQA Threshold (MTCO2e/ ear 1_ <br />10,000 <br />Exceeds Threshold <br />No <br />CEQ NEPA Threshold (v1TCO2e/y8ar) <br />25,000 <br />Exceeds Threshold <br />No <br />4 <br />Alternative 3: Reduced Intensity Alternative <br />Construction Emissions <br />Construction GHG emissions for Alternative 3 were calculated by the same <br />methods used for the Proposed Project. GHG emissions for each construction <br />activity and the total construction effort are shown in Table 26. The total <br />construction GHG emissions, which would occur over a two-year period, would <br />be substantially less than the one year CEQA and NEPA thresholds. <br />Construction GHG emissions for Alternative 3 would be less than those for the <br />Proposed Project. <br />Table 26: Estimate Alternative 3 Construction Greenhouse Gas Emissions <br />Activity <br />Unit Emissions <br />(MTr,02ej <br />N4m4er of <br />Aptivities <br />Total <br />emls'slons <br />(MT0,02e) <br />Pipelines, Shared Structures, Herftagp Site <br />105 <br />1 <br />105 <br />Well DriYYin <br />66 <br />4 <br />264 <br />Well Development <br />31 <br />4 <br />124 <br />Well Equipping <br />2 <br />3 <br />6 <br />Paving <br />13 <br />1 <br />13 <br />Total Construction Emissions <br />512 <br />SCAQMD CEQA Threshold (MTCO2e/year) <br />10,000 <br />Exceeds Threshold <br />No <br />CEQ NEPA Threshold (MTCO2e1 year) <br />25,000 <br />Exceeds Threshold <br />No <br />See A rpendix B far CaIEEMod Mod 0 Outputs <br />Mid Basin Centennial Park 2 9 efVA Project Final EIR 5-94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.