My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />at the Heritage Museum would not be in conflict with City of Santa Ana Zoning <br />Code. <br />City of Santa Ana General Plan <br />The following is a consistency evaluation of the Proposed Project with relevant <br />General Plan policies and objectives. <br />Ensure that the impacts of development are mitigated. <br />• Protect the community from incompatible land uses. <br />Support identification and development of new sources of water, <br />Encourage multiple use of water and other natural facilities such as <br />reservoirs and flood control channels. <br />Conservation Element Objective 2.1: Conserve water resources in <br />commercial, residential and recreation uses. <br />Develop local water recycling programs and cooperate with regional <br />recycling efforts. <br />As identified in the Draft EIR all potential significant impacts to Heritage Museum <br />and the surrounding area associated with the construction and operation of the <br />Proposed Project have been reduced' to a less than significant level. <br />To avoid potential incompatible land uses conflicts the proposed monitoring well <br />would be located below an existing parking area. <br />The proposed monitoring well would provide water quality monitoring to provide <br />additional water supplies for the City of Santa Ana and would help to reduce the <br />regional demands for imported water supplies. <br />Alternative 3: Reduced Intensity Alternative <br />Under Alternative 3, one less injection well would be constructed. All of the other <br />land use components would be the same as the Proposed Project. Similar to the <br />Proposed Project the implementation of Alternative 3 would not result in adverse <br />land use compatibility impacts, would not result in the loss of usable open and <br />would not be in conflict with City of Santa Ana General Plan and Zoning Code.. <br />No adverse land use impacts or conflicts with relevant planning programs would <br />occur. <br />Alternative 4: Pipeline Design Alternative <br />Under Alternative 4, an alternative pipeline alignment would be constructed. All <br />of the other land use components would be the same as the Proposed Project. <br />Similar to the Proposed Project, the implementation of Alternative 4 would not <br />result in adverse land use compatibility impacts, would not result in the loss of <br />usable open and would not be in conflict with City of Santa Ana General Plan and <br />Mid Basin Centennial Park ZWP2143IProject Final EIR 5-142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.