Laserfiche WebLink
Section 5 <br />4 <br />Single F-at-ri y_h <br />nort_ <br />57.0 <br />581 <br />171--- <br />600 <br />Edinger Ave. <br />_60 _3 <br />5 <br />Single Family north <br />57.3 � <br />59 _0 <br />1.7 <br />Edinger Ave. <br />6 <br />Single family north <br />64,3 <br />-6-4-6 <br />03 <br />673 <br />Edinger Ave <br />7 <br />Single family north <br />602 <br />CU <br />0.6 <br />632 <br />Edinger Ave. <br />8 <br />Multi Family north <br />58.9 <br />59.0 <br />0.1 <br />61 9 <br />Edinger Ave. <br />9 <br />North Centennial <br />52.1 <br />53.9 <br />1,8 <br />55.1 <br />Education Center <br />10 <br />Sourtheast -Centennial <br />49.2 <br />51.2 <br />2.0 <br />Sa <br />Education Center <br />I <br />11 <br />Single Family east <br />66.7 <br />i 66.8 <br />0_1 <br />693 <br />Fairview Street <br />12 <br />Single Family east <br />66.3 <br />66.5 <br />0.2 <br />693 <br />Fairview Street <br />_� <br />'13 <br />Single Family east <br />66.3 <br />_66.4 <br />02 <br />69.3 <br />Fairview Street <br />14 <br />Single Family east <br />663 <br />66.4 <br />0.1 <br />69.3 <br />Fairview Street <br />Is <br />I North Godinez High <br />48.4 <br />50.6 <br />2.2 <br />so <br />School <br />Northwest Mitchell <br />374 <br />39.4 <br />2.0 <br />SG <br />School <br />17 <br />North Heritage <br />42.9 <br />44.5 <br />1.13 <br />50 <br />Museum Structure <br />18 <br />South Godinez High <br />38_.2 <br />38.3 <br />0.1 <br />50 <br />School <br />19 <br />Northwest Godinez <br />35,3 <br />56.2 <br />14,9 <br />so <br />High School <br />I -City Noise Slandard or A rinbient No is a I pr,W +N JB When Existiog Nuoso. Lev n Is Move 1,11y Slairdand <br />Bold -Eueads Noise Standard Threshold <br />Phase 2 Construction Activities <br />The Phase 2 construction activities would include: Sound Wall Construction and <br />Removal at l Conductor Casing Installation at l Borehole Drilling and <br />Reaming at M81-5; and Well Construction at MBI-5. The sound wall construction <br />and conductor casing installation would occur during the clay. The borehole <br />drilling and reaming at MBI-5 and Well Construction at MBI-5 Would occur 24 <br />hours per day- Since it is not possible for any of the above activities to occur <br />simultaneouisly, each of the four construction activities associated with Phase 2 <br />have been analyzed separately below. <br />Mid Basin Centennial Park 28c6-ri2v Project Final EIR 5-156 <br />