My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />17 North Heritage Museum 48.1 48 1 0.2 55.0 <br />Structure <br />is South Gcdinez High 43.3 43.3 0.0 <br />School <br />7-9 Northwest -Godinez High -46.2 -46.8 0,6 55.0 <br />School <br />I 70ty Noise Standard or A rnblent Nalsp IeveB A r1B Wripin Existing Nnike I.revets Above City Standard <br />B.1d -E.cer,ds Noop Standwd Thro&huld <br />MBI-2 Borehole DrillinglReaming and MBI-3 Well Development <br />The noise levels generated during concurrent borehole drilling at MBI-2 and well <br />development at M131-3 are shown in Table 52 and Table 53. The borehole drilling <br />activities would occur 24 hours seven days a week over an 8 day period. <br />Additionally, test engines utilized in the well development of M131-5 would be <br />required to operate 12 to 24 hours a day to simulate well operations. The <br />duration of engine testing would be 6 days for 12 hours and 1 day for 24 hours. <br />Table 52: MBI-2 Borehole Drilling and MBI-3 Well Development Day Time <br />Noise Levels <br />'Receiver <br />Description <br />Extatirig <br />Ex'W410 + <br />Increase ^ <br />Threshold <br />Constroction <br />1 <br />Multi Family west Santa <br />41,8 <br />60.6 <br />8.8 <br />55.0 <br />Ana River <br />2 <br />Multi Family west Santa <br />61.9 <br />62,1 <br />02 <br />84.9 <br />Ana River <br />3 <br />Single Family north <br />65.6 <br />65.7 <br />0 1 <br />68.6 <br />Edinger Ave, <br />4 <br />Single Family north <br />64.4 <br />64.7 <br />0,3 <br />67.4 <br />Edinger Ave. <br />5 <br />Single Family north <br />643 <br />64.8 <br />0,11 <br />67.7 <br />Edinger Ave. <br />6 <br />Single family north <br />713 <br />71.7 <br />On <br />74.7 <br />Edinger Ave. <br />7 <br />Single family north <br />67.6 <br />67.6 <br />0,0 <br />70.6 <br />Edinger Ave, <br />8 <br />Multi Family north <br />66.2 <br />66.2 <br />0.0 <br />69.2 <br />Edinger Ave. <br />9 <br />North Centennial <br />59.5 <br />59.9 <br />0.4 <br />62.5 <br />Education Center <br />10 <br />Southeast Centennial <br />54.8 <br />54.8 <br />M <br />55.0 <br />Education Center <br />11 <br />Single Family east <br />71,8 <br />71.8 <br />0.0 <br />74.8 <br />Fairview Street <br />12 <br />Single Family east <br />71.3 <br />71.3 <br />0,0 <br />74.3 <br />Mid Basin Centennial Park Jjg3dnj " Project Final EIR 5-174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.