Laserfiche WebLink
Section 5 <br />With the construction of the sound walls, the well borehole drilling activities would <br />result in noise levels that would range from a 0.1 dB increase to a TO dB <br />increase. As shown in Table 58, the construction activity would not exceed the <br />daytime noise standard. Additionally, the borehole drilling activities would be <br />conducted during the day when the construction activity would be exempt under <br />the City's Noise Ordinance. Potential noise impacts would be less than <br />significant. <br />Mid Basin Centennial Park I tect')n 283 Well project Final EIR 5-182 <br />- <br />Edinger Ave <br />4 <br />Single Family north- <br />64.4 <br />64.5 <br />0.1 - <br />67.4 <br />Edinger Ave. <br />5 <br />Single Family north <br />647 <br />649 <br />0.2 <br />767.7 <br />Edinger Ave. <br />16 <br />Single family north <br />717 <br />71.8 <br />01 <br />74.7 <br />Edinger Ave. <br />7 <br />Single family north N <br />67.6 <br />67.8 <br />02 <br />706 <br />Edinger Ave. <br />8 <br />Multi Family north <br />66,2 <br />663 <br />0.1 <br />7-9 -2 <br />Edinger Ave. <br />9 <br />North Cantenniai <br />59.5 <br />59,2 <br />-03 1 <br />62.5 <br />Education Center <br />10 <br />Southeast Centennial <br />54,8 <br />54.8 <br />0.0 <br />550 <br />Education Center <br />11 <br />Single Family east <br />71,8 <br />71 8 <br />0.0 <br />748 <br />Fairview Street <br />12 <br />Stogie Family east <br />71.3 <br />71.3 <br />0.0 <br />74,8 <br />Fairview Street <br />7-3 <br />Single Family east <br />71,3 <br />71.3 <br />00 <br />74.8 <br />Fairview Street <br />1-4 <br />Single Family east <br />71.4 <br />71.4 <br />0.0 <br />74.4 <br />Fairview Street <br />15 <br />North Godinez High <br />5,16 <br />53,6 <br />0,0 <br />55.0 <br />School <br />16 <br />Northwest Mitchell <br />435 <br />440 <br />0,5 <br />55.0 <br />School <br />17 North Heritage 48.1 48,2 0.1 55.0 <br />Museum Structure <br />18 South Godinez High 43.3 43.3 D'O 550 <br />School <br />9 Northwest Godinez 46.2 48.8 2.6 55,0 <br />High School <br />I =C ty Noise Standard or At tr b! on I NDt so Jo el +-3' d D W hen E x i sfing Noise Loamy; Above City S,t an dafd <br />H.Id =E.G..ds N.,S, sttwiaA ThrkshDId <br />With the construction of the sound walls, the well borehole drilling activities would <br />result in noise levels that would range from a 0.1 dB increase to a TO dB <br />increase. As shown in Table 58, the construction activity would not exceed the <br />daytime noise standard. Additionally, the borehole drilling activities would be <br />conducted during the day when the construction activity would be exempt under <br />the City's Noise Ordinance. Potential noise impacts would be less than <br />significant. <br />Mid Basin Centennial Park I tect')n 283 Well project Final EIR 5-182 <br />- <br />