My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />constructed at the finished grade of the parking lot to provide access into each <br />vault. Each vault would be approximately 260 square feet and would be <br />excavated to a depth of 15 feet below the ground surface. The drilling activities <br />for each injection Well Would require continuous 24 hour drilling over a three <br />month period. During the well drilling phase, a work area averaging about <br />12,200 square feet would be needed for each well site. To minimize the <br />temporary loss of parking area, after the well drilling activities are completed the <br />work area would be reduced to 3,000 square feet to equip each well. A total of <br />three moths would be needed to equip each well after well drilling is completed. <br />Construction of Shared Recreation /Communication Structures <br />Power and communication would be required at each injection welll. The <br />electrical, communication and process control equipment would be shared in two <br />above ground structures that would function as utility rooms for OCWD and <br />public restroom/changing rooms and a park office for Centennial Park staff. The <br />configuration of the two shared recreation /communication structures is shown in <br />Figure 4. <br />The first shared recreation/communication structure would be located near the <br />northwest corner of Centennial Park adjacent to the soccer fields. A 1,050 square <br />foot shared structure would be built that would contain 220 square foot public <br />restrooms, 550 square foot changing area for soccer teams and a 280 square <br />foot utility room for OCWD, The proposed shared structure would be constructed <br />on an existing asphalt area adjacent to the soccer field complex. A 200 foot long, <br />10 foot wide American Disabilities Act approved pervious surface sidewalk would <br />be constructed to provide pedestrian access from the Centennial Park parking lot <br />to the soccer field and to the Santa Ana River Bike Trail. <br />The second shared recreation/communication structure would be located near <br />the Centennial Park Skate Park. An existing 576 square foot restroom structure <br />would be demolished and replaced with a 596 square foot shared structure. The <br />shared structure would contain 212 square foot public restroom, 178 square foot <br />park office and 206 square foot utility room. A concrete walkway ranging in size <br />from 3 feet to 10 feet would be provided around the perimeter of the shared <br />structure. The park office would be oriented towards the skate park to allow <br />Centennial Park staff to supervise the activities at the skate park. Additionally, to <br />increase the defensibility of the skate park an existing 3 foot high fence around <br />the skate park would be replaced with a new 8 foot high fence and a surveillance <br />camera would be installed and wired to the park office. <br />Mid Basin Centennial Park 1 <br />t' 6 g4l Project Final Elf" 3-7 <br />A _0 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.