My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - DISTRICT A LANDSCAPE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25D - AGMT - DISTRICT A LANDSCAPE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 10:00:58 AM
Creation date
6/16/2016 3:54:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25D
Date
6/21/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor treated the tree then Contractor shall be responsible for the cost of treatment to <br />restore the tree to a healthy condition or replace the tree, The latest American Shade Tree <br />Conference guidelines for value determination will determine the value of the trees lost. <br />By entering into agreement with the City the Contractor acknowledges that they accept <br />the condition of each tree and should a tree go into decline or expire, the Contractor <br />agrees to replace the tree with like species and size or agree that the City shall withhold <br />payment equal to the value of the tree, <br />6.0 Weeds, Disease and Pest Control -- All Areas <br />Agricultural pest control services shall be performed by a state licensed /certified agricultural pest <br />control sub - contractor or employee, <br />The Contractor shall notify the Director's Representative via email a minimum of 48 hours in <br />advance of any pesticide applications. The required information shall be the name of the <br />company performing the application, the proposed pesticides to be applied listing the <br />manufacturer /name of the pesticide, the rate(s) of application, the reentry period and the method <br />of application. Furthermore, the Contractor shall copy the email to the Agricultural <br />Commissioner's Office, thereby, notifying their Inspectors of your sub - contractor's or <br />QAL /QAC intent to apply pesticides. Furthermore, Contractor's sub - contractor or QAL /QAC <br />shall post on A -frame barricades plastic sealed 18 "x24" at minimum 300' intervals (where <br />applicable) public notification posters listing the company performing the application, the <br />proposed pesticides to be applied listing the manufacturer /name of the pesticide, the rate(s) of <br />application, the reentry period and the method of application, <br />6.1 Weed Control <br />All hardscape and landscape areas shall be kept free of weeds at all times. Weeds shall <br />be removed by hand and/or approved mechanical or chemical methods. The Director's <br />Representative may dispatch City staff or other contractor's to remove /eradicate weeds <br />that reach two (2) inches or greater or when weeds exist in turf areas and are not <br />removed /eradicated immediately. In such instance, the cost will be deducted from the <br />Contractor's monthly invoice. <br />Contractor, in accordance with the Agronomic Plan — Pre - Emergent may apply <br />Dimension and Gallery to all turf areas (except sport /priority fields due for renovation <br />within twelve weeks) and Snapshot two tunes per year minimum to all <br />groundcover /shrub areas. Note that when applying Snapshot Contractor shall take <br />precaution not to overlap the application on to adjacent turf. Should damage occur to <br />adjacent turf, the Contractor shall remove the damaged turf and replace the affected area <br />with Greg Norman 1 Hybrid Bermuda thick out sod to the satisfaction of the Director's <br />Representative. <br />Beginning in April all turf shall be. sprayed /applied with post - emergent herbicides <br />Revolver (16 -17 oz /acre), Speedzone non -ionic surfactant and ferrous oxide pre -mixed in <br />a tank, per the agronomic pre - emergent plan. All applications shall be applied by a state <br />licensed Qualified Applicator sub - contractor or QAL /QAC using a calibrated boom <br />sprayer with appropriate nozzles. Following the initial application of post- emergent <br />City of Santa Ana RFP 16 -063 <br />Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.