My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65A - RFQ - 3RD AND BROADWAY DEV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
07/05/2016
>
65A - RFQ - 3RD AND BROADWAY DEV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 3:31:15 PM
Creation date
6/30/2016 3:35:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
65A
Date
7/5/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be performed according to all zoning, open space, and public right -of -way standards to the <br />satisfaction of the Planning and Building and Public Works Agencies. <br />4.2.3 Developer shall improve the alley adjacent to the property according to <br />specifications determined during the entitlement review process. <br />4.2.4 Developer shall remove the existing pedestrian bridges. <br />4.3 Covenant to Operate Retail Uses on Ground Floor. The Developer hereby covenants that <br />the ground floor of the Project as described in the Scope of Development shall be used <br />exclusively for pedestrian oriented commercial uses, and no other use shall be pennitted without <br />the written consent of the City. This covenant shall be incorporated into the Grant Deed <br />conveying the City Property from the City to Developer. <br />4.4 Development Review. Within the times established in the Schedule of Performance, the <br />Developer shall submit to the City for review and approval all construction plans, drawings and <br />related documents for the construction and development work to be done on the City Property. <br />The new development project shall be designed by a highly credible design team to exemplify <br />the City's commitment to excellent design and sustainability in Santa Ana, including <br />earthquake /seismic standards. Final construction plans and drawings are defined as those in <br />sufficient detail to obtain a building permit. <br />4.4.1 The Developer shall obtain all approvals and permits that may be required under <br />the City's normal plan check, development review and approval process for the construction and <br />development work to be completed on the City Property, or applicable portion thereof, and shall <br />pay all fees and costs associated with such review consistent with the City's normal entitlement <br />process. The Project, and all plans, drawings and related documents for the development of the <br />City Property, shall be consistent with the City's General Plan and Zoning Code. During the <br />preparation of any drawings and plans for the development and construction work to be <br />completed on the City Property, the Developer shall meet with City staff and communicate and <br />consult informally and as frequently as is necessary to ensure that the formal submittal of any <br />documents to the City pursuant to this Section 4.4 can receive prompt consideration. <br />4.4.2 The City shall approve or disapprove the plans, drawings and related documents <br />submitted pursuant to this Section 4.4 in accordance with City's normal plan check procedures. <br />Any disapproval shall state in writing the reasons for disapproval and the changes that the City <br />requests be made. Such reasons and such changes must be consistent with the Scope of <br />Development and any items previously approved hereunder by the City. The Developer, upon <br />receipt of a disapproval, shall revise such plans, drawings and related documents and resubmit <br />them to the City as soon as possible after receipt of the notice of disapproval, provided that in no <br />case shall the City be entitled to require changes inconsistent with the Scope of Development and <br />any previously approved items. <br />4.4.3 If the Developer desires to make any material change in the construction plans <br />after their approval by the City, the Developer shall submit the proposed change to the City for <br />its approval. If the construction plans, as modified by the proposed change, conform to the <br />55394.00000\29008220.1 65A-1 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.