Laserfiche WebLink
Appendix <br />ATTACHMENT 4 <br />FEESCHEDULE <br />CEOTECHNTCAL. SPECIAL INSPECTION. & MATERIAL TESTING <br />ITEM <br />ESTIMATED <br />QUANTITY <br />UNIT <br />HOURLY RATE/ <br />UNIT COST* <br />ESTIMATED <br />COST <br />Soil Inspection <br />1,000 <br />Hours <br />$83.00 <br />$83,000.00 <br />Concrete Inspection <br />1,500 <br />Hours <br />$83.00 <br />$124,500.00 <br />Masonry Inspection <br />800 <br />Hours <br />$83.00 <br />$66,400.00 <br />Reinforcing Steel <br />Inspection <br />1,200 <br />Hours <br />$83.00 <br />$99,600.00 <br />Asphalt Concrete <br />Inspection <br />500 <br />Hours <br />$83.00 <br />$41,500.00 <br />6" Concrete Cylinder <br />400 <br />Units <br />$25.00 <br />$10,000.00 <br />2x4 Mortar Sample <br />200 <br />Units <br />$25.00 <br />$5,000.00 <br />3x3x6 Grout Sample <br />200 <br />Units <br />$25.00 <br />$5,000.00 <br />Masonry Prisms <br />150 <br />Units <br />$85.00 <br />$12,750.00 <br />Ultrasonic Testing of <br />Steel Connectors <br />50 <br />Each * <br />$89.00 <br />$4,450.00 <br />Post Tension Reinforcing <br />Inspection <br />200 <br />Hours <br />$83.00 <br />$16,600.00 <br />Post Tension Concrete <br />Inspection <br />200 <br />Hours <br />$83.00 <br />$16,600.00 <br />Structural Steel <br />Inspection <br />100 <br />Hours <br />$83.00 <br />$8,300.00 <br />Connection Bolt Torque <br />Testing <br />100 <br />Each <br />$83.00 <br />$8,300.00 <br />Precast Concrete <br />350 <br />Hours <br />$83.00 <br />$29,050.00 <br />Deputy Inspection <br />100 <br />Hours <br />$83.00 <br />$8,300.00 <br />Mechanical Inspection <br />100 <br />Hours <br />$83,00 <br />$8,300.00 <br />Plumbing Inspection <br />100 <br />Hours <br />$83.00 <br />$8,300.00 <br />Electrical Inspection <br />100 <br />Hours <br />$83.00 <br />$8,300.00 <br />*Assume 4 tests minimum per site visit. $564,250.00 <br />TOTAL ESTIMATED COST $ <br />Page 2 of 2 <br />City of Santa Ana RFP 15-055 <br />Page A4-1 <br />