Laserfiche WebLink
2. Licensee's Duties <br />By execution of this Agreement,, LICENSEE agrees for itself and on behalf of its <br />employees, agents, consultants and contractors as follows: <br />a. All work performed by LICENSEE on License Area I shall comply with the <br />current edition of the Standard Specifications for Public Works Construction (Green Boo DC and <br />all applicable CITY Ordinances, Standards and Specifications currently in effect. The work, <br />including method of installation and limits of constriction of the fiber optic cable shall be <br />depicted on a plan and shall be subject to review inspection and approval by the City Engineer. <br />Any contractor performing work shall first obtain an excavation permit from the CITY. <br />The LICENSEE shall endeavor to maintain and repair the License Area 1 from private <br />property owned or controlled by LICENSEE, if practical. Any maintenance or repair of the <br />conduit or its contents via the CITY's right of way shall require the LICENSEE to apply for and <br />obtain an excavation permit from the CITY. <br />b. LICENSEE accepts full responsibility for all damages and restoration and agrees <br />to reimburse CITY for performing all work and furnishing all materials to correct any failure to <br />comply with the rules and terms hereof and all applicable CITY regulations. <br />C. All work shall be done by a State Licensed Contractor with the appropriate <br />classification. In addition, the contractor shall possess a current CITY Business License, <br />d. Traffic. <br />Traffic control shall comply with CITY Standard Plan No. 1125F and the <br />Work Area Traffic Control Handbook (WATCH). Amber lights must be <br />maintained at night. <br />Any street closure shall comply with CITY Standard Plan No 1125F. <br />e. Fire Hydrant permits shall be obtained from the Public Works Agency before <br />water is obtained from any public hydrant. <br />f. LICENSEE or its contractor shall patch all authorized street cuts to CITY <br />Standards, including baekfilling with 90 percent relative compaction and temporary AC <br />pavement. LICENSEE or its contractor shall place permanent patch within 30 days of placing <br />the temporary patch. A CITY Street Construction Inspector must be present to inspect <br />placement of backfill and both temporary and permanent patches. <br />g. Refuse, rubble, gravel, dirt or unused materials shall be removed on a daily basis <br />and final cleanup shall take place within 3 clays after completion of the work. If not so removed, <br />CITY will remove such refuse, rubble, gravel, dirt or unused materials at LICENSEE's expense, <br />including the current call -out charge. <br />11. UTILITY MARKINGS. Upon completion of the installation work, or any <br />necessary service work, LICENSEE shall require that its contractor shall remove all painted <br />Page 2 of 8 <br />25G -28 <br />