My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:18:23 PM
Creation date
7/28/2016 2:55:05 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
10-6719
Agency
Public Works
Council Approval Date
4/5/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[JUN 2 0 Zola <br />c A(z CITY OF SANTA ANA <br />CONSTRUCTION CONTRACT AGREEMENT <br />PROJECT NO. 10-6719 <br />TRAFFIC SIGNAL EQUIPMENT PHASE II — BIKE, TRAIL <br />This CONSTRUCTION CONTRACT is made and entered into this 5"' day of April, 2016, by <br />and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal <br />corporation organized and existing tinder the Constitution and laws of the State of California, <br />hereinafter referred to as "CITY" and California Professional Engineering Inc., hereinafter <br />referred to as "CONTRACTOR". <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as <br />follows: <br />CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost <br />and expense necessary to construct and complete in a good and workmanlike manner and to <br />the satisfaction of the City Engineer of the CITY, the Traffic Signal Equipment Phase 11— <br />Bike Trail Project, hereinafter referred to as the "Work of Improvement", identified in <br />and in accordance with the Contract Documents prepared by the City's Public Works Agency <br />and approved by the City Council. <br />2. The complete Construction Contract consists of the "Contract Documents," as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />• Notice Inviting Bids <br />• Information to Bidders <br />• Bid Proposal <br />• Bid Bond <br />• Contract Form <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Project Plans <br />• Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the <br />Work of Improvement the sun total amount not to exceed $47,800, as set forth and <br />identified in the BID PROPOSAL, which is attached hereto and incorporated herein as <br />Exhibit "A". The BID PROPOSAL contains a schedule of unit price(s) or lump sums) <br />based on approximate quantities only, and the City does not expressly or by implication <br />agree that the actual alnount of work will correspond therewith, but reserves the right to <br />increase or decrease the amount of any class or portion of the work or to omit portions of the <br />work as may be deemed necessary or advisable. <br />1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.