Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT' NO. 15-6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />4 <br />5 <br />Furnish and Install UPS Cabinet and UPS <br />assembly <br />Relocate existing traffic signal controller <br />assembly to new controller cabinet <br />Description <br />EA00 <br />EA <br />Unit <br />Unit Price <br />6 <br />Rewire Intersection <br />1 <br />Ls <br />00 <br />1 00 <br />7 <br />Remove existing pull box <br />I <br />EA <br />$ <br />8 <br />Furnish and Install No, 6E Pull Box <br />2 <br />EA <br />$ <br />Furnish and Install new 2" conduit <br />20 <br />LF <br />$ J; <br />$ <br />I a- <br />Furnish and Install new 3' conduit <br />220 <br />LF <br />$ <br />11 <br />Furnish and Install new 4" conduit <br />40 <br />LF <br />oto, 1-6 <br />12 <br />Terminate fiber drop cable in Aber patch <br />I <br />EA <br />$ /0 <br />carrel <br />Furnish and Install 410'rrace Wire <br />260 <br />LF <br />ffII13 <br />$ <br />14 <br />Re-pull distribution cable from controller <br />I <br />EA <br />cabinet to 06E Pull -Brox <br />TOTAL <br />ALTERNATE <br />Blit#3 <br />$ <br />Alt, -mat,, Bid 44 - Wilson Strcet at Harbor Blvd Cabinet Upgradas - City of Costa M2Sa <br />Item Description MY Unit Unit Price Amount <br />Remove and salvage existing traffic signal I EA $ 500 ,.9,0 $500.40, <br />cabinet. <br />Furnish and Install Type P cabinet on A J <br />2 1 EA , q5D, <br />existing foundation <br />3 Relocate existing traffic signal controller I EA $ gw. 60 $ I SA 00 <br />assembly to new controller cabinet <br />TOTAL ALTERNATE BID#4 $ `v. 0 <br />Alternate Bid #5 - Hamilton Street at Harbor Blvd Cabinet Upgrades - City of Costa Mesa <br />Item <br />Description <br />CRY <br />Unit <br />Unit Price <br />Amount <br />Remove and salvage existing traffic signal <br />I <br />EA. <br />cabinet. Remove foundation complele,— <br />BP -6 <br />