Laserfiche WebLink
State Revolving Fond - General Application , <br />a <br />Attachment III — I: PROJECT INFORMATION <br />Project Description: Sewer Collection System Improvements <br />Project will replace existing deteriorated and over capacity sewer mains and related sewer assets such as <br />manholes and laterals. The project will also incorporate trenchless technologies such as pipe lining where <br />appropriate to extend the service life of existing sewer collection pipelines in a low impact manner. Project will <br />eliminate undersized sewer mains, remedy sewer main failures, reduce inflow and infiltration, reduce sewer <br />maintenance and prevent sewer spills. Projects will be phased as follows: <br />• Phase 1 -$1.9M <br />• Willard Neighborhood <br />• Columbine Avenue <br />• Phase 2 -$1.7M <br />• Heninger Park Neighborhood <br />• Eastside Neighborhood <br />• Phase 3 -$1.8M <br />• Downtown Neighborhood <br />• French Park Neighborhood <br />• Phase 4 -$1.5M <br />o Wilshire Square Neighborhood <br />• Phase 5 -$1.5M <br />• Floral Park Neighborhood <br />• West Floral Park Neighborhood <br />• Phase 6 -$1.1M <br />o Artesia Filar Neighborhood <br />EXHIBIT 6 <br />55B -41 <br />Page 2 of 11 <br />