My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - CLEAN DRINKING WATER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
08/02/2016
>
55B - RESO - CLEAN DRINKING WATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 3:40:18 PM
Creation date
7/28/2016 3:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
8/2/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Revolving Fund - Ceueral Application <br />CD; <br />Section VI. SUSTAINABILITY <br />Attachment G1: <br />Since Santa Ana is a predominantly built -out city, it will become challenging to find areas that can <br />accommodate new housing or other developments for future residents. The projections associated with <br />the Land Use Element reflectthatthe City's population may decrease slightly in the near term but will <br />increase overtime. As housing demand increases and available land becomes more limited, it is <br />anticipated that there will bean increasing trend toward higher- density residential development. The <br />Information below Is excerpted from the City's General Plan, <br />REDEVELOPMENT PLANS <br />Prior to the elimination of Redevelopment Agencies in California in 2011, an estimated 5,185 acres (8.1 <br />square miles) of land in Santa Ana was Included In one Merged Project Area. Prior to August 2004, the <br />Project Area was divided into six separate redevelopment project areas as described below. Of this <br />total, 9 percent (464 acres) is in residential use, 32 percent (1,678 acres) commercial, 40 percent <br />(2,075 acres) industrial, with other uses accounting for the remaining 19 percent (968 acres), The <br />following six redevelopment plans have been adopted. <br />• Santa Ana Redevelopment Plan. This plan, which encompassed 694 acres, was adopted in <br />1973 to revitalize the downtown area, Improve traffic circulation, reestablish business, and <br />stimulate private investment. <br />• North Harbor Boulevard Redevelopment Plan. Adopted in 1982, the Plan covered 470 acres <br />along Harbor Boulevard. The Plan for this area was adopted to define future development, and <br />create design standards for new development in the area. <br />• Inner -City Commuter Station Redevelopment Plan. This plan, also adopted in 1982, focused in <br />approximately 525 acres designed to provide for the development of a commuter rail station <br />and to promote supporting uses. <br />• South Main Street Redevelopment Plan, Adopted in 1982, the plan applied to 1,500 acres in <br />one of the primary commercial and industrial districts of the City. <br />• South Harbor Boulevard /Fairview Street Redevelopment Plan. Adopted in 1982, this 1,085 <br />acre plan covered a key Industrial area in the vicinity of Harbor Boulevard and Fairview Street. <br />• Bristol Corridor Redevelopment Plan. Adopted In 1989, the plan promoted the <br />redevelopment of a 781 -acre area along the Bristol Street corridor of the City. <br />The locations of the previously existing redevelopment project areas are shown in the map below. <br />Page 4 of 11 <br />EXHIBIT 6 <br />55B -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.