My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BIG BEN, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BIG BEN, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:15:50 PM
Creation date
7/28/2016 3:31:07 PM
Metadata
Fields
Template:
Contracts
Company Name
BIG BEN, INC.
Contract #
09-3213
Agency
Public Works
Council Approval Date
5/3/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL Exhibit A <br />PROJECT NO, 09-3213 <br />CENTENNIAL PARK NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />BIO PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to fumish <br />all material and do all the work required to complete the said work In accordance with said plans (if <br />any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: <br />Item <br />Bid Item <br />Unit <br />MY <br />Unit Price <br />Amount <br />1' <br />8" Class 200 AWWA C900 <br />P.V.C. Water Main <br />LF <br />19,700 <br />$_±2 -go <br />$/ <br />Construct 1" Water <br />2. <br />Service and Connect to <br />EA <br />486 <br />$ <br />Existing Meter <br />Construct 2" Water <br />3. <br />Service and Connect to <br />EA <br />12 <br />$_ :� 0W'ro <br />Existing Meter <br />4. <br />esilient Wedge Gate <br />Valve <br />EA <br />40 <br />$_K_ 3ili <br />$ �j• (lPi <br />Fire Hydrant Assembly <br />S. <br />(includes gate valve and <br />EA <br />31 <br />$ 11(i7✓, a <br />lateral pipe) <br />4" Fire Service form Main <br />6. <br />and Connect to Existing <br />EA <br />1 <br />$ 5-'.7 av <br />$ �,r �, 7 <br />Detector Check Valve <br />7 <br />Pavement Replacement <br />(Beyond 1' T -cut) <br />SF <br />8,400 <br />$_� 15 <br />$ 56,7DLt,o <br />8. <br />2" Blow Off Assembly per <br />City Std Plan No 1414 <br />EA <br />9. <br />Traffic Loop Detector <br />EA <br />10 <br />$ 11. 70, sy <br />10. <br />Signing and. Striping <br />IS <br />1 <br />11, <br />Traffic Control <br />LS <br />12 <br />CCTV Inspection of <br />Existing Sewer Mains <br />LF <br />17,700 <br />�•�• <br />CCTV Inspection o <br />Existing Sewer Laterals <br />EA <br />486 <br />9/7 � <br />P-1 ofP-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.